Browse product categories

23.8/24-inch Android touch all-in-one computer
23.8/24-inch Android touchscreen all-in-one, commercial tablet all-in-one, Android digital signage display, commercial tablet computer and Android touch computer.
Enquire about this productThis Android touch all-in-one computer also functions as an Android tablet. It is widely used for checkout, healthcare, smart homes, access control, industrial smart terminals, video intercoms, elderly care, ride-hailing advertising and smart advertising. It can run standard Android applications and customer-developed APKs. Custom options include TTL, RS232 and RS485 serial ports, IC, ID and NFC card readers, built-in PoE power and a built-in 4G IoT module. CPU options include A33, A64, A83T, RK3128, RK3188, RK3288 and RK3399. Standard features include a multi-touch capacitive screen, a 2-megapixel front camera upgradeable to 5 megapixels, microphone, RJ45 Ethernet and Wi-Fi. Contact us to discuss your requirements.





| System | CPU | Quad-core Cortex-A9, 1.6G, RK3188 | ||||||||||||
| RAM | 1GB | |||||||||||||
| Memory | 8GB | |||||||||||||
| Operating system | Android 4.4 | |||||||||||||
| Touchscreen | 10-point capacitive touch | |||||||||||||
| Display | LCD screen | 24-inch Full HD display, LED backlight | ||||||||||||
| Resolution | 1920*1080 | |||||||||||||
| Display area | 527.04(H)x296.46mm(V) | |||||||||||||
| Display mode | Normally black, IPS | |||||||||||||
| Viewing angle | 89/89(H),89/89(V) | |||||||||||||
| Contrast ratio | 1000 | |||||||||||||
| Brightness | 250cdm2 | |||||||||||||
| Aspect ratio | ,16:9 | |||||||||||||
| Network connectivity | WiFi | 802.11b/g/n | ||||||||||||
| 3G dongle | 3G USB dongle ext. | |||||||||||||
| Ethernet | 10M/100M | |||||||||||||
| Bluetooth | Bluetooth 4.0 | |||||||||||||
| Interfaces | Card reader | Supports SD/MMC cards | ||||||||||||
| USB OTG | Mini USB OTG | |||||||||||||
| USB Hostx2 | USB 2.0 | |||||||||||||
| Power input | DC12V power input | |||||||||||||
| RJ45 | Ethernet interface | |||||||||||||
| Headphones | 3.5mm headphones | |||||||||||||
| Media playback | Video formats | MPEG-1,MPEG-2,MPEG-4,H.263,H.264,RV etc.,support up to 1080p | ||||||||||||
| Audio formats | MP3/WMA/AAC etc. | |||||||||||||
| Image formats | jpeg | |||||||||||||
| Other | Power consumption | 35W | ||||||||||||
| Wall mounting | VESA,100x100mm | |||||||||||||
| Speakers | 2*3W | |||||||||||||
| OSD languages | Multilingual OSD including Chinese and English | |||||||||||||
| Operating temperature | 0–40 degrees | |||||||||||||
| Certifications | CE/FCC/RoHS | |||||||||||||
| Accessories | User manual | |||||||||||||
| Adapter, 12V/4A | ||||||||||||||
| Circular finger stand | ||||||||||||||
| Packaging dimensions (mm) | ||||||||||||||
| Device dimensions | Printed retail box | Outer carton: 2 pcs/CTN. | ||||||||||||
| L | W | H | L | W | H | L | W | H | ||||||
| 580mm | 349.2mm | 32.5mm | 655mm | 115mm | 455mm | 670mm | 250mm | 480mm | ||||||
| Net(kg) | 4.8kg | Net(kg) | 6.6kg | Net | 13.2kg | |||||||||
| G.W | 14.2kg | |||||||||||||
| Dra wi ng | ||||||||||||||
| System | CPU | Quad-core Cortex-A9, 1.6G, RK3188 | ||||||||||||
| RAM | 1GB | |||||||||||||
| Memory | 8GB | |||||||||||||
| Operating system | Android 4.4 | |||||||||||||
| Touchscreen | 10-point capacitive touch | |||||||||||||
| Display | LCD screen | 24-inch Full HD display, LED backlight | ||||||||||||
| Resolution | 1920*1080 | |||||||||||||
| Display area | 527.04(H)x296.46mm(V) | |||||||||||||
| Display mode | Normally black, IPS | |||||||||||||
| Viewing angle | 89/89(H),89/89(V) | |||||||||||||
| Contrast ratio | 1000 | |||||||||||||
| Brightness | 250cdm2 | |||||||||||||
| Aspect ratio | ,16:9 | |||||||||||||
| Network connectivity | WiFi | 802.11b/g/n | ||||||||||||
| 3G dongle | 3G USB dongle ext. | |||||||||||||
| Ethernet | 10M/100M | |||||||||||||
| Bluetooth | Bluetooth 4.0 | |||||||||||||
| Interfaces | Card reader | Supports SD/MMC cards | ||||||||||||
| USB OTG | Mini USB OTG | |||||||||||||
| USB Hostx2 | USB 2.0 | |||||||||||||
| Power input | DC12V power input | |||||||||||||
| RJ45 | Ethernet interface | |||||||||||||
| Headphones | 3.5mm headphones | |||||||||||||
| Media playback | Video formats | MPEG-1,MPEG-2,MPEG-4,H.263,H.264,RV etc.,support up to 1080p | ||||||||||||
| Audio formats | MP3/WMA/AAC etc. | |||||||||||||
| Image formats | jpeg | |||||||||||||
| Other | Power consumption | 35W | ||||||||||||
| Wall mounting | VESA,100x100mm | |||||||||||||
| Speakers | 2*3W | |||||||||||||
| OSD languages | Multilingual OSD including Chinese and English | |||||||||||||
| Operating temperature | 0–40 degrees | |||||||||||||
| Certifications | CE/FCC/RoHS | |||||||||||||
| Accessories | User manual | |||||||||||||
| Adapter, 12V/4A | ||||||||||||||
| Circular finger stand | ||||||||||||||
| Packaging dimensions (mm) | ||||||||||||||
| Device dimensions | Printed retail box | Outer carton: 2 pcs/CTN. | ||||||||||||
| L | W | H | L | W | H | L | W | H | ||||||
| 580mm | 349.2mm | 32.5mm | 655mm | 115mm | 455mm | 670mm | 250mm | 480mm | ||||||
| Net(kg) | 4.8kg | Net(kg) | 6.6kg | Net | 13.2kg | |||||||||
| G.W | 14.2kg | |||||||||||||
| Dra wi ng | ||||||||||||||
Please contact us for the configuration and specification of this product.
No file is currently published for this product. Email zy@erpsz.net with the product model to request documentation.
Frequently asked questions
What is 23.8/24-inch Android touch all-in-one computer?
23.8/24-inch Android touch all-in-one computer: 23.8/24-inch Android touchscreen all-in-one, commercial tablet all-in-one, Android digital signage display, commercial tablet computer and Android touch computer.
Who provides 23.8/24-inch Android touch all-in-one computer?
ZEVON Industrial Technology provides it. Founded in 1993, the company covers industrial hardware manufacturing, digital factory systems and smart city integration.
Which industries use it?
Manufacturing, automotive, electronics, food and beverage, logistics and public infrastructure projects.
How do I get specifications or a quotation?
Email zy@erpsz.net with your application, volume and delivery location. The team replies with specifications, lead time and pricing.
7-inch Android touch all-in-one computer
17.3-inch Android touch all-in-one computer
15.6-inch Android touchscreen all-in-one computer