Power Bank MES and Quality Traceability

Contact us

Lightweight MES and Quality Traceability for Power Bank Manufacturing: Functions and Solution

Lightweight MES and quality traceability solution specifically for the power bank industry.

Power bank MES data acquisition, three-code linkage, finished-product testing, and association of the finished-product SN, cell SN and protection-board SN to complete three-code linkage and cell data acquisition.

1. Solution Overview

As the power bank industry faces increasing requirements for product safety, consistent quality, production efficiency, after-sales traceability and regulatory compliance, traditional methods relying on manual records, Excel ledgers, paper process cards and offline storage of test data can no longer adequately meet manufacturers’ needs for transparent production processes, precise quality traceability, real-time exception blocking and standardized data management.

This solution addresses the production characteristics of power banks by establishing a lightweight manufacturing execution and quality traceability system, focusing on:

  • Cell data acquisition
  • Protection-board/PCBA data acquisition
  • Finished-product SN management
  • Linking cell SNs to protection-board SNs
  • Three-code linkage of finished-product SNs, cell SNs and protection-board SNs
  • Finished-product test data acquisition
  • Integration of burn-in, capacity and charge/discharge test data
  • Packaging and warehouse-receipt data acquisition
  • Blocking quality exceptions
  • Forward tracking and backward tracing
  • After-sales quality analysis

Centered on a unique product identity code, the system associates barcodes, QR codes, serial numbers, equipment data, process routes, operator actions, test results and material batches to form a complete traceability loop: from incoming cells to finished-product shipment, and from shipped products back to their production history.

2. Implementation Objectives

1. Digitize power bank production

Upload key shop-floor process data to the system in real time through barcode collection, workstation production reporting, test-equipment integration and automated data acquisition, reducing manual records and improving data accuracy.

2. Manage three-code linkage

Address the industry’s core traceability requirements by establishing strong associations among:

  • Finished-product SN
  • Cell SN
  • Protection-board SN/PCBA SN

These three identifiers form the product’s complete identity relationship chain.

Example:

Finished-product SNCell SNProtection-board SNLinkage timeLinkage workstationOperator
PB202501010001CELL202412250088PCB2024122800322025-01-01 10:20:35Assembly workstation 1Zhang San

Once the three codes are linked, scanning any one of them can retrieve all associated quality information.

3. Provide full-process quality traceability

The system can trace the complete quality data of a power bank, from cells, protection boards, housings and auxiliary materials through finished-product assembly, testing, burn-in, packaging, warehouse receipt, shipment and after-sales service.

This includes:

  • Production work order
  • Production line
  • Workstation information
  • Operators
  • Equipment ID
  • Test data
  • Exception records
  • Repair records
  • Shipment customer
  • After-sales repair-return records

4. Block quality exceptions in real time

The system can automatically block processing when it detects:

  • Duplicate SNs
  • Testing attempted before a cell is linked
  • Packaging attempted before a protection board is linked
  • A cell SN that does not exist
  • A protection-board SN not yet received into stock
  • A failed finished-product test
  • Incomplete burn-in testing
  • Out-of-specification test data
  • Skipped process stations
  • The same cell linked more than once
  • The same protection board linked more than once
  • Use of materials from a blacklisted batch
  • A repaired defective product that has not been retested

System-based error prevention keeps nonconforming products from reaching the next operation or the customer.

5. Support after-sales backward tracing and batch risk control

If an issue is discovered with a finished-product SN after sale, the system can quickly trace:

  • Which cell the product uses
  • The cell’s supplier and batch
  • The cell’s tested capacity, internal resistance and voltage at the time
  • The protection board’s batch
  • Whether the protection board passed testing
  • The finished-product test parameters
  • The production date, work order, line and operator
  • Other products from the same batch
  • Whether a batch hold or recall is necessary

3. Overall System Architecture

The system can use a lightweight browser/server architecture and support access from web clients, PDA terminals, barcode scanners, industrial PCs, test equipment, label printers and other terminals.

1. Architecture Layers

Equipment acquisition layer

Includes:

  • Barcode scanners
  • Handheld PDA terminals
  • Industrial tablets
  • Test computers
  • Cell test cabinets
  • Finished-product testers
  • Burn-in cabinets
  • Charge/discharge test cabinets
  • Capacity testers
  • Internal-resistance testers
  • Protection-board testers
  • Electronic scales
  • Label printers
  • PLC/serial devices
  • Industrial PCs

Data acquisition layer

Collects the following from shop-floor equipment:

  • SNs
  • Cell codes
  • PCBA codes
  • Test data
  • Workstation data
  • Operator data
  • Equipment data
  • Production time
  • Defect information
  • Repair data

MES business layer

Mainly includes:

  • Work order management
  • Product model management
  • Barcode rule management
  • Workstation data acquisition management
  • Three-code linkage management
  • Test data management
  • Defect and repair management
  • Packaging management
  • Warehouse receipt management
  • Shipment management
  • Quality traceability management
  • Reporting and analysis management

Data services layer

Handles:

  • Data storage
  • Data cleansing
  • Data validation
  • Data interfaces
  • ERP/WMS/QMS integration
  • Equipment interfaces
  • Report statistics
  • Access control

Application presentation layer

Supports:

  • PC management clients
  • Production-line workstation clients
  • Quality dashboards
  • Production dashboards
  • PDA clients
  • Query clients
  • After-sales traceability clients

4. Core Business Processes

1. Establish Master Data

Maintain the relevant master data before the system goes live.

Product model data

Includes:

  • Product model
  • Product name
  • Rated capacity
  • Battery type
  • Number of cells
  • Cell series/parallel configuration
  • Input specifications
  • Output specifications
  • Fast-charging protocols
  • Housing color
  • Packaging method
  • Customer part number
  • Company part number
  • Version number

Example:

FieldExample
Product modelPB-10000W
Capacity10000mAh
Cell specification5000mAh × 2
Cell typePolymer cell
Protection-board modelPCB-PD22.5W-V1.2
Input portType-C
Output portsUSB-A/Type-C
Fast-charging protocolsPD/QC/SCP/FCP
ColorBlack

BOM data

Maintain the bill of materials for each power bank:

  • Cells
  • Protection board
  • Housing
  • Middle frame
  • Wires
  • Screws
  • Nickel strips
  • Adhesive tape
  • Labels
  • Retail box
  • User manual
  • Auxiliary packaging materials

The system can support individual traceability of critical materials and batch traceability of noncritical materials.

Critical materials generally include:

  • Cells
  • Protection board/PCBA
  • Charging management IC
  • MOS transistors
  • NTC
  • Inductors
  • Flame-retardant housing materials

Process route data

Configure the manufacturing route for power bank products, for example:

  1. Scan incoming cells
  2. Cell testing/capacity grading
  3. Receive cells into stock
  4. Scan incoming protection boards
  5. Protection-board testing
  6. Receive protection boards into stock
  7. Issue materials to production
  8. Scan cells at line entry
  9. Scan protection boards at line entry
  10. Link cells and protection boards
  11. Assemble semifinished products
  12. Generate/print finished-product SNs
  13. Link finished-product SNs
  14. Finished-product functional testing
  15. Burn-in testing
  16. Retesting
  17. Visual inspection
  18. Packaging
  19. Carton-code linkage
  20. Warehouse receipt
  21. Shipment

The system can configure different process routes for different products and prevent skipped stations.

5. Three-Code Linkage and Data Acquisition

1. Definition of the Three Codes

The core traceability objects in power bank manufacturing generally include three key identifiers:

Finished-product SN

The finished-product SN uniquely identifies the final product sold. It is usually placed on the product housing, nameplate label or packaging box, or recorded internally in the system.

It can be used for:

  • After-sales queries
  • Shipment management
  • Authenticity checks
  • Customer traceability
  • Product lifecycle management

Cell SN

The cell SN is a unique number provided by the cell supplier or assigned internally by the manufacturer. It can trace:

  • Cell supplier
  • Cell batch
  • Production date
  • Capacity-grading data
  • Capacity
  • Internal resistance
  • Voltage
  • Thickness
  • Weight
  • Incoming inspection results
  • Where the cell was used

Protection-board SN

The protection-board SN may also be called the PCBA SN or BMS-board SN. It can trace:

  • PCBA supplier
  • SMT batch
  • Production date
  • Program version
  • Test results
  • Batches of critical components
  • Where the board was used

2. Three-Code Linkage Methods

The system supports multiple linkage modes.

Mode 1: Link the cell and protection board first, then link the finished-product SN

Suitable where a semifinished assembly is made before a finished-product code is generated.

Process:

  1. Scan the cell SN
  2. Scan the protection-board SN
  3. The system validates both statuses
  4. Link the cell and protection board
  5. Assemble the semifinished product
  6. Print or scan the finished-product SN
  7. Link the finished-product SN to the semifinished product
  8. Complete three-code linkage

Mode 2: Scan the finished-product SN first, then link the cell and protection board in sequence

Suitable where the finished-product housing or nameplate label is coded in advance.

Process:

  1. Scan the finished-product SN
  2. Scan the cell SN
  3. The system checks whether the cell is available for use
  4. Scan the protection-board SN
  5. The system checks whether the protection board is available for use
  6. Complete three-code linkage automatically
  7. Move the product to the next operation

Mode 3: Link multiple cells to one finished product

Some power banks use multiple cells in parallel or series/parallel combinations, for example:

  • 1 cell
  • 2 cells in parallel
  • 3 cells
  • 4 type-18650 cells
  • A combination of multiple cylindrical cells

The system supports linking multiple cell SNs to one finished-product SN, for example:

Finished-product SNCell SN 1Cell SN 2Cell SN 3Cell SN 4Protection-board SN
PB100001CELL001CELL002CELL003CELL004PCB001

The required number of linked cells can be configured from the product BOM. The system prevents station completion if too few cells are scanned and raises an alarm if too many are scanned.

Mode 4: One protection board per finished product

For products that each use only one protection board, the system requires each protection-board SN to be linked only once, preventing reuse or incorrect assembly.

3. Three-Code Linkage Validation Rules

The system should perform strict validation during linkage.

Finished-product SN validation

  • Does it exist?
  • Is it duplicated?
  • Does it belong to the current work order?
  • Does it belong to the current product model?
  • Is it already linked to another cell?
  • Is it already linked to another protection board?
  • Is its status eligible for linkage?
  • Is it locked or scrapped?

Cell SN validation

  • Does the cell SN exist?
  • Has incoming inspection been completed?
  • Have capacity grading, voltage testing and internal-resistance testing been completed?
  • Has it passed?
  • Is it already linked to another finished product?
  • Does it belong to a currently permitted batch?
  • Does it match the current product model?
  • Does its capacity meet the requirements?
  • Is its voltage within range?
  • Is its internal resistance within range?
  • Is the cell blacklisted?
  • Has its storage period expired?

Protection-board SN validation

  • Does the protection-board SN exist?
  • Has it passed functional testing?
  • Has the correct program version been flashed?
  • Does it match the product model?
  • Is it already linked to another finished product?
  • Does it have a repair record?
  • Has it passed retesting?
  • Does it belong to a currently permitted batch?
  • Is the protection board blacklisted?

4. Handling Linkage Results

After successful linkage, the system should automatically record:

  • Finished-product SN
  • Cell SN
  • Protection-board SN
  • Work order number
  • Product model
  • Production line
  • Workstation
  • Operator
  • Equipment ID
  • Linkage time
  • Linkage result
  • Exception information
  • Process version
  • Software version
  • Material batch

If linkage fails, the system should:

  • Display the failure reason in a pop-up
  • Trigger audible and visual alarms
  • Prevent station completion
  • Record an exception log
  • Allow handling by an authorized supervisor
  • Support creation of an exception ticket

6. Cell Data Acquisition Functions

Cells are central to power bank quality and safety. The system needs to focus on collecting data throughout the cell lifecycle, from receipt to use.

1. Scan and Register Incoming Cells

When cells arrive at the factory, the system supports collection by carton, pallet, batch or individual SN.

Data includes:

  • Cell SN
  • Supplier
  • Supplier batch
  • Receipt date
  • Purchase order number
  • Delivery note number
  • Cell model
  • Nominal capacity
  • Nominal voltage
  • Cell type
  • Production date
  • Received quantity
  • Carton/pallet number
  • Inspection status

2. Cell IQC Inspection Data

The system supports entry or import of IQC results:

  • Visual inspection
  • Dimensional inspection
  • Thickness
  • Width
  • Length
  • Weight
  • Open-circuit voltage
  • Internal resistance
  • Capacity sampling inspection
  • Leakage inspection
  • Swelling inspection
  • Tab inspection
  • Barcode legibility inspection
  • Packaging inspection
  • RoHS/environmental compliance documents
  • Safety compliance documents
  • Inspection conclusion

Inspection results are classified as:

  • Pass
  • Accepted under concession
  • Pending decision
  • Fail
  • Returned
  • On hold

3. Cell Capacity Grading and Capacity-Test Acquisition

The system can connect to capacity-grading and capacity-test cabinets to automatically collect:

  • Cell SN
  • Test equipment ID
  • Channel number
  • Test start time
  • Test end time
  • Charge capacity
  • Discharge capacity
  • Charging voltage
  • Discharge cutoff voltage
  • Charging current
  • Discharging current
  • Internal resistance
  • Test temperature
  • Cycle count
  • Capacity grade
  • Test result

The system automatically determines, against preset criteria:

  • Whether capacity meets the requirement
  • Whether voltage is normal
  • Whether internal resistance exceeds the limit
  • Whether cells belong to the same grade
  • Whether use on the production line is permitted

4. Cell Matching Management

For power banks with multiple cells, the system can support matching rules:

  • Capacity-difference limit
  • Voltage-difference limit
  • Internal-resistance-difference limit
  • Prefer the same batch
  • Prefer the same supplier
  • Prefer the same production date
  • Prefer the same grade

For example:

  • Capacity difference between two parallel cells ≤ 50mAh
  • Voltage difference ≤ 0.02V
  • Internal-resistance difference ≤ 3mΩ

If a limit is exceeded, the system prevents linkage and displays:

The voltage difference between cells CELL001 and CELL002 exceeds the limit. Matching is not permitted.

5. Cell Inventory Status Management

Each cell has a lifecycle status in the system:

  • Pending inspection
  • IQC passed
  • Capacity grading in progress
  • Capacity grading passed
  • Received into stock
  • Issued to production
  • Entered the production line
  • Linked
  • Assembled
  • Scrapped
  • Returned
  • On hold

Status controls prevent duplicate cell use, use before required steps are completed, and the introduction of abnormal cells to production.


7. Protection-Board/PCBA Data Acquisition Functions

The protection board is a core component for safe power bank charging and discharging, protocol recognition, overvoltage and overcurrent protection, and temperature protection.

1. Register Incoming Protection Boards

Data includes:

  • Protection-board SN
  • PCBA batch number
  • Supplier
  • SMT batch
  • Production date
  • Board number
  • Hardware version
  • Software version
  • Program version
  • Customer version
  • Incoming quantity
  • IQC status

2. Protection-Board Test Data Acquisition

The system supports connection to protection-board test fixtures or test equipment to automatically collect:

  • Input-voltage test
  • Output-voltage test
  • Output-current test
  • No-load current
  • Standby power consumption
  • Overcurrent protection
  • Overvoltage protection
  • Short-circuit protection
  • Overtemperature protection
  • NTC detection
  • USB-A output test
  • Type-C input/output test
  • PD protocol test
  • QC protocol test
  • SCP/FCP protocol test
  • Charging recognition test
  • Communication test
  • LED display test
  • Button test
  • Program-version verification
  • Flashing result

3. Protection-Board Status Management

Statuses include:

  • Pending inspection
  • Testing in progress
  • Test passed
  • Test failed
  • Awaiting repair
  • Repair in progress
  • Repair completed
  • Retest passed
  • Received into stock
  • Issued to production
  • Linked
  • Scrapped
  • On hold

Only protection boards with a status of “Test passed” or “Retest passed” may be linked to a finished product.

8. Finished-Product SN Management

1. SN Coding Rules

The system supports flexible configuration of finished-product SN rules, for example:

Brand code + product model + date + line + sequence number

Example:

PB25A202501010001

Meaning:

  • PB: product category, Power Bank
  • 25A: product model code
  • 20250101: production date
  • 0001: sequence number

The system can also generate the following according to customer requirements:

  • Customer SN
  • Internal SN
  • Anti-counterfeit code
  • IMEI-like unique code
  • Retail-box code
  • Carton code
  • Pallet code

2. SN Generation and Printing

The system supports:

  • Batch SN generation by work order
  • Automatic generation according to production quantity
  • Reprinting as needed
  • Prevention of duplicate printing
  • Traceability of printing records
  • Print template management
  • Barcodes, QR codes and Data Matrix codes
  • Label-printer integration

Printed content can include:

  • Finished-product SN
  • Product model
  • Capacity
  • Input/output specifications
  • Production date
  • Customer part number
  • Certification marks
  • Anti-counterfeit QR code

3. SN Status Transitions

Finished-product SN statuses include:

  • Generated
  • Printed
  • Entered the production line
  • Cell linked
  • Protection board linked
  • Three-code linkage completed
  • Testing in progress
  • Test passed
  • Test failed
  • Repair in progress
  • Retest passed
  • Burn-in in progress
  • Burn-in completed
  • Packaging completed
  • Received into stock
  • Shipped
  • Returned for after-sales repair

9. Finished-Product Test Data Acquisition

Finished-product testing is a core part of MES quality control for power banks. The system should support automatic test-equipment integration as well as manual entry or file import.

1. Finished-Product Functional Testing

Acquisition items include:

  • Finished-product SN
  • Test equipment ID
  • Test fixture ID
  • Test workstation
  • Operator
  • Test time
  • Input voltage
  • Input current
  • Output voltage
  • Output current
  • Charging power
  • Discharging power
  • Type-C port test
  • USB-A port test
  • Micro port test
  • Lightning port test
  • PD fast-charging protocol
  • QC fast-charging protocol
  • SCP/FCP protocols
  • Low-current mode
  • LED indication
  • Digital display
  • Button functions
  • Temperature detection
  • Protection functions
  • No-load power consumption
  • Conversion efficiency
  • Test result

2. Capacity Testing

Collect:

  • Discharge capacity
  • Rated capacity
  • Usable capacity
  • Conversion efficiency
  • Discharge duration
  • Discharge-voltage curve
  • Discharge-current curve
  • Cutoff voltage
  • Temperature-rise data
  • Test result

3. Burn-In Testing

Burn-in test data can be collected by batch, workstation and channel.

Data includes:

  • Finished-product SN
  • Burn-in cabinet ID
  • Burn-in channel number
  • Burn-in start time
  • Burn-in end time
  • Burn-in duration
  • Burn-in current
  • Burn-in voltage
  • Temperature curve
  • Unexpected power-loss records
  • Burn-in result

The system can be configured to:

  • Prevent station completion if the burn-in duration is insufficient
  • Automatically lock products with burn-in exceptions
  • Send products that fail burn-in for repair
  • Automatically release products when burn-in is complete

4. Finished-Product Test Evaluation Rules

The system sets upper and lower test limits by product model, for example:

Test itemLower limitUpper limitUnit
Type-C output voltage4.855.20V
Output current1.902.20A
PD output power1822.5W
No-load current0100μA
Conversion efficiency85100%

If a measurement is outside the permitted range, the system automatically marks the result NG and prevents progression to the next operation.

5. Test Data Tamper Prevention

The system should record:

  • Raw test data
  • Upload time
  • Test equipment
  • Operator
  • Data file
  • Data source
  • Modification records
  • Retest records

Manual modification can be disabled for critical test data to preserve the authenticity of quality traceability.


10. Production Error Prevention and Mistake-Proofing

1. Prevent Duplicate Linkage

The same cell SN cannot be linked to multiple finished products.

The same protection-board SN cannot be linked to multiple finished products.

The same finished-product SN cannot be repeatedly linked to different cells or protection boards.

2. Prevent Skipped Stations

The system checks the current product status against the process route, for example:

  • Finished-product testing cannot begin until three-code linkage is complete
  • Burn-in cannot begin until testing has passed
  • Packaging cannot begin until burn-in is complete
  • Warehouse receipt is not permitted until packaging is complete
  • Shipment is not permitted before warehouse receipt

3. Prevent Incorrect Materials

The system checks against the work order, BOM and material batch:

  • Whether the cell model is correct
  • Whether the protection-board model is correct
  • Whether cell capacity matches
  • Whether the protection-board software version matches
  • Whether the packaging label meets customer requirements

4. Automatically Block Defective Products

A product with an NG test result automatically changes to “Defective” status. The system prevents further processing until it has been repaired, passed retesting and been released again.

5. Blacklist Management

The system supports blacklisting:

  • Cell SNs
  • Cell batches
  • Protection-board SNs
  • PCBA batches
  • Finished-product SNs
  • Work orders
  • Supplier batches

Scanning a blacklisted item automatically raises an alarm and prevents its use.

11. Defect and Repair Management

1. Defect Registration

Defects can originate from:

  • Cell test failures
  • Protection-board test failures
  • Finished-product functional test failures
  • Burn-in failures
  • Visual inspection failures
  • Defective customer returns
  • Defective products returned for after-sales repair

Defect information includes:

  • Defective item SN
  • Defect operation
  • Defect code
  • Defect description
  • Defect images
  • Discovery time
  • Person discovering the defect
  • Equipment ID
  • Defect severity
  • Responsibility attribution

2. Repair Process Records

Repair records include:

  • Repair technician
  • Repair time
  • Defect cause
  • Repair actions
  • Replaced materials
  • Replacement cell SN
  • Replacement protection-board SN
  • Repair remarks
  • Repair result

If a cell or protection board is replaced during repair, the system should automatically remove the original active linkage or preserve it as historical linkage, establish the new relationship and retain the complete history.

Example:

Original linkage:

  • Finished-product SN: PB001
  • Cell SN: CELL001
  • Protection-board SN: PCB001

After replacing the protection board during repair:

  • Finished-product SN: PB001
  • Original protection board: PCB001; status: removed during repair/scrapped
  • New protection board: PCB008; status: linked
  • The system records the repair change history

3. Release After Retesting

Retesting is mandatory after repair.

The system can require:

  • Repeat finished-product testing after repair
  • Repeat burn-in after repair
  • Repeat visual inspection after repair
  • Packaging only after the retest passes

12. Packaging and Carton-Code Linkage

1. Individual Product Packaging Scan

The packaging workstation scans the finished-product SN, and the system checks:

  • Whether three-code linkage is complete
  • Whether the finished product passed testing
  • Whether burn-in is complete
  • Whether visual inspection passed
  • Whether any defect records remain open
  • Whether the product is on hold
  • Whether it belongs to the current packaging work order

Packaging is permitted once the checks pass.

2. Retail-Box Code Linkage

If the retail box has an independent barcode, the system can:

  • Link the finished-product SN to the retail-box code
  • Prevent use of the wrong box
  • Prevent incorrect customer labels

3. Carton-Code Linkage

The system supports carton-based packaging:

  • Set the number of units per carton
  • Scan the carton code
  • Scan finished-product SNs into the carton
  • Close the carton automatically when full
  • Link the carton code and finished-product SNs
  • Print the packing list
  • Print the carton label

Carton-code data example:

Carton codeFinished-product SNsQuantityWork orderPackaging time
CTN20250101001PB001-PB05050MO202501012025-01-01

4. Prevent Incorrect Mixing in Cartons

The system checks:

  • Whether products in the carton have the same model
  • Whether they are for the same customer
  • Whether they belong to the same work order
  • Whether they have the same color
  • Whether they have the same version
  • Whether mixed packing is allowed

Products cannot be added to a carton if the rules are not met.


13. Warehouse Receipt and Shipment Management

1. Finished-Product Warehouse Receipt

Scan the carton or pallet code during receipt. The system checks:

  • Whether all products in the carton have passed
  • Whether the carton code has been closed
  • Whether receipt would be duplicated
  • Whether the products are on hold
  • Whether they belong to the current receipt document

2. Shipment Scanning

Scan the carton code or finished-product SN at shipment. The system records:

  • Shipment document number
  • Customer name
  • Shipment date
  • Shipment quantity
  • Carton code
  • Finished-product SN
  • Product model
  • Work order number

After shipment, product status changes to “Shipped.”

3. Customer Traceability

When a customer reports an issue with an SN, shipment records can identify the specific:

  • Shipment batch
  • Customer order
  • Carton code
  • Work order
  • Production date
  • Cell batch
  • Protection-board batch
  • Test data

14. Quality Traceability Functions

1. Forward Tracking

Track raw materials through finished products to customers.

For example, scanning a cell batch can show:

  • Total cells received in the batch
  • Quantity that passed IQC
  • Quantity that passed capacity grading
  • Quantity already used
  • The finished-product SNs in which they were used
  • Whether those finished products have been shipped
  • The customers receiving them
  • Whether any defect feedback exists

2. Backward Tracing

Trace all production and material data backward from the finished-product SN.

Scanning the finished-product SN can retrieve:

  • Basic finished-product information
  • Production work order
  • Production date
  • Production line
  • Operator
  • Cell SN
  • Cell batch
  • Cell capacity/voltage/internal resistance
  • Protection-board SN
  • Protection-board test data
  • Finished-product test data
  • Burn-in records
  • Packaging carton code
  • Warehouse receipt records
  • Shipment records
  • After-sales repair records

3. Relationship-Based Tracing

The system supports related queries for:

  • All finished products made with the same cell batch
  • All finished products made with the same protection-board batch
  • All finished products made under the same work order
  • Products tested on the same equipment
  • Products handled by the same operator
  • Products associated with the same exception code
  • Products shipped to the same customer

4. Batch Risk Holds

If a cell batch is found to present a risk, the system can quickly locate:

  • Unused cells in inventory
  • Semifinished products already on the line but not shipped
  • Packaged finished products not yet shipped
  • Products already shipped to customers

It also supports:

  • Placing inventory on hold
  • Placing finished products on hold
  • Generating a risk list
  • Exporting a recall list
  • Notifying the relevant departments

15. Reports and Dashboards

1. Production Reports

  • Work order completion rate
  • Production-line output
  • Workstation output
  • Hourly output
  • Daily output
  • Personnel efficiency
  • First-pass yield
  • Process yield
  • Work order progress

2. Quality Reports

  • Cell defect rate
  • Protection-board defect rate
  • Finished-product test failure rate
  • Burn-in failure rate
  • Visual defect rate
  • Defect-code ranking
  • Defect-cause analysis
  • Supplier quality comparison
  • Batch quality analysis
  • Customer-complaint traceability analysis

3. Test Data Analysis

  • Capacity distribution
  • Voltage distribution
  • Internal-resistance distribution
  • Conversion-efficiency distribution
  • Output-power distribution
  • Burn-in exception trends
  • Equipment-channel exception analysis

4. Dashboard Display

Shop-floor dashboards can display:

  • Current work order
  • Planned quantity
  • Quantity produced
  • Passed quantity
  • Defective quantity
  • Yield
  • Target attainment rate
  • Exception alarms
  • Workstation cycle time
  • Equipment status

16. System Interface Solution

1. ERP Interface

ERP integration can support:

  • Work order release
  • BOM synchronization
  • Material master-data synchronization
  • Purchase order synchronization
  • Return of warehouse-receipt results
  • Return of shipment results
  • Inventory-status synchronization

2. WMS Interface

Warehouse-system integration can support:

  • Cell warehouse receipt
  • Protection-board warehouse receipt
  • Production material issue
  • Finished-product warehouse receipt
  • Finished-product shipment
  • Hold/release

3. Test-Equipment Interfaces

Multiple integration methods are supported:

  • RS232/RS485 serial connections
  • TCP/IP
  • OPC UA
  • Modbus
  • Database reads
  • Monitoring CSV/TXT/Excel files
  • API interfaces
  • SDK integration

4. Label-Printing Interfaces

Supports:

  • Zebra
  • TSC
  • Godex
  • Argox
  • Zebra printers
  • Chinese-made industrial label printers

Automatic printing can be implemented through:

  • BarTender
  • NiceLabel
  • Print templates
  • ZPL commands
  • TSPL commands

17. Permissions and Data Security

1. User Permissions

The system assigns permissions by role:

  • Administrator
  • Production supervisor
  • Quality supervisor
  • Process engineer
  • Warehouse staff
  • Production-line operator
  • Repair technician
  • After-sales staff
  • Customer query user

2. Operation Permissions

Critical operations require access control:

  • Deleting data
  • Modifying test results
  • Removing three-code linkages
  • Scrapping products
  • Releasing defective products
  • Releasing batch holds
  • Changing process routes
  • Changing test criteria

3. Operation Logs

The system records all critical operations:

  • Operator
  • Operation time
  • Operation details
  • Data before modification
  • Data after modification
  • Operation IP address
  • Terminal ID

18. Recommended Implementation Steps

Phase 1: Launch Core Traceability

Initial focus:

  • Product data
  • Work order management
  • SN management
  • Cell SN acquisition
  • Protection-board SN acquisition
  • Three-code linkage
  • Finished-product test-result acquisition
  • Basic traceability queries

Objective: first establish unique product identities and three-code-linked traceability.

Phase 2: Quality Process Control

Add:

  • IQC inspection
  • Cell capacity-grading data acquisition
  • Protection-board test data acquisition
  • Automatic finished-product test-equipment integration
  • Defect and repair management
  • Skipped-station and incorrect-material prevention

Objective: establish closed-loop production quality control.

Phase 3: Packaging, Warehouse Receipt and Shipment Traceability

Add:

  • Packaging scans
  • Carton-code linkage
  • Warehouse-receipt scans
  • Shipment scans
  • Customer traceability

Objective: establish complete traceability from production to the customer.

Phase 4: Data Analysis and Intelligent Dashboards

Add:

  • Production dashboards
  • Quality dashboards
  • Yield analysis
  • Batch analysis
  • Equipment analysis
  • Supplier quality analysis

Objective: enable data-driven management.


19. System Value

1. For Production

  • Reduce manual records
  • Improve production transparency
  • Prevent incorrect or missing assembly
  • Improve work order execution efficiency
  • Track output and progress in real time

2. For Quality

  • Locate quality problems quickly
  • Trace finished products back to raw materials
  • Support supplier quality evaluation
  • Support batch risk control
  • Make after-sales analysis easier

3. For Engineering

  • Understand test-data distributions
  • Optimize process parameters
  • Analyze equipment exceptions
  • Track software and hardware versions

4. For After-Sales Service

  • Retrieve product history quickly from the finished-product SN
  • Determine whether an issue affects a batch
  • Respond to customers faster
  • Support recalls and responsibility determination

5. For Management

  • Strengthen product quality control
  • Reduce quality risks
  • Meet customer factory-audit requirements
  • Improve the organization’s level of digitalization
  • Support brand compliance and safety management

20. Typical Traceability Scenarios

Scenario 1: A customer reports that a power bank will not charge

After-sales staff scan finished-product SN PB202501010088.

System query results:

  • Production work order: MO20250101
  • Production date: 2025-01-01
  • Production line: Line A
  • Operator: Li Si
  • Cell SN: CELL202412250199
  • Cell capacity: 5012mAh
  • Cell internal resistance: 18mΩ
  • Cell voltage: 3.82V
  • Protection-board SN: PCB202412280066
  • Protection-board test: Pass
  • Finished-product test: Pass
  • Burn-in test: Pass
  • Packaging carton code: CTN20250101005
  • Shipment customer: Customer XX
  • Shipment date: 2025-01-05

If an issue is subsequently found in the same protection-board batch, all finished-product SNs involving that batch can be queried to determine whether to place inventory on hold or notify customers.

Scenario 2: A cell batch presents a safety risk

Quality staff enter cell batch CELL-BATCH-20241225.

The system returns:

  • Received quantity: 10,000 cells
  • Quantity used: 8,500 cells
  • Remaining inventory: 1,500 cells
  • Affected finished products: 4,250 units
  • Quantity shipped: 3,800 units
  • Unshipped inventory: 450 units
  • Affected customers: Customer A, Customer B and Customer C
  • List of affected carton codes
  • List of affected finished-product SNs

The system can place unshipped products on hold with one click and export a recall list for products already shipped.


21. Key Function Summary

Master Data and Basic Management

  • Product model management
  • BOM management
  • Process route management
  • Work order management
  • Material management
  • Customer master-data management
  • Supplier management
  • Barcode rule management
  • Label template management

Data Acquisition

  • Cell SN acquisition
  • Cell test data acquisition
  • Protection-board SN acquisition
  • Protection-board test data acquisition
  • Finished-product SN acquisition
  • Three-code linkage acquisition
  • Finished-product test data acquisition
  • Burn-in data acquisition
  • Visual inspection data acquisition
  • Packaging data acquisition
  • Warehouse receipt and shipment data acquisition

Quality Management

  • IQC inspection
  • IPQC patrol inspection
  • FQC inspection
  • OQC inspection
  • Defect registration
  • Repair management
  • Retest management
  • Scrap management
  • Hold and release
  • Blacklist management

Traceability Management

  • Finished-product SN traceability
  • Cell SN traceability
  • Protection-board SN traceability
  • Work order traceability
  • Batch traceability
  • Carton-code traceability
  • Customer shipment traceability
  • After-sales backward tracing

Reports and Dashboards

  • Work order progress reports
  • Output reports
  • Yield reports
  • Defect-analysis reports
  • Test-data reports
  • Batch-quality reports
  • Supplier-quality reports
  • Production dashboards
  • Quality dashboards

22. Simplified End-to-End Business Loop

The process can be summarized as:

  1. Assign or collect cell codes on factory receipt
  2. Test cells and receive passing cells into stock
  3. Assign or collect protection-board codes on factory receipt
  4. Test protection boards and receive passing boards into stock
  5. Release the production work order
  6. Generate the finished-product SN
  7. Scan the finished-product SN
  8. Scan the cell SN
  9. Scan the protection-board SN
  10. Complete three-code linkage
  11. Perform finished-product functional testing
  12. Perform burn-in testing
  13. Perform visual inspection
  14. Link the packaging carton code
  15. Receive the finished product into stock
  16. Scan at shipment
  17. Trace backward by SN during after-sales service