ZEVON Industrial Technology Equipment Management System Solution
This solution is presented in six areas: business processes, requirements analysis, functions, implementation, implementation benefits and operating environment. An equipment management solution is a comprehensive systems-engineering project and lays the foundation for success. The quality of an equipment management system depends on whether its solution is scientifically sound and reasonable. Many customers in China pay insufficient attention to feasibility and are unwilling to invest the necessary time, effort and expense. Consequently, later scalability, usability and overall system coherence suffer. Because executives may have limited knowledge of equipment management software, they can only make superficial comparisons of supplier qualifications, demonstrations and communications, without professionally determining how the system should be used in their enterprise, the characteristics of their equipment management or the value it could deliver. Most enterprises therefore avoid in-depth investigation or a detailed solution before implementation. Instead, several software companies are asked to submit proposals for comparison. Without a thorough understanding of actual equipment management, these suppliers piece together impressive-looking proposals. The enterprise's real business processes, logic, equipment-management procedures, operating procedures and existing problems are obscured by polished presentations and previous success stories. Only after signing a contract does the enterprise discover the large gap between the proposal and reality, forcing a choice between them. In many cases, even before use begins, the system no longer meets actual needs. Employees are reluctant to use it, it is gradually abandoned, and intended savings become wasted expenditure. A few years later another software company is engaged to redevelop and implement the system, while the underlying cause of the recurring cycle remains unresolved.
1. Business Processes
An equipment management system uses computer networking to manage the actual operation of equipment systematically. Software connects traditional business processes into a coherent management framework, replacing isolated, fragmented and stage-based practices with unified, systematic, digital management throughout the equipment lifecycle. Repetitive and trivial manual work is completed systematically, releasing human and material resources and improving overall operational efficiency. Recordkeeping that is prone to errors or difficult to interpret becomes systematic and standardized, laying a foundation for standardized enterprise management. The system is a platform for comprehensive equipment management in a modern enterprise. It connects production, management and decision-making departments through a centralized shared equipment database and integrated data collection, transmission and processing. It supports automatic generation of equipment inspection, repair, maintenance, lubrication, servicing, spare-parts, early-warning and statistical-analysis records and reports. These help improve standards, maintain awareness of operating conditions, implement preventive maintenance, maintain and improve performance, reduce failures, extend component life, increase equipment utilization and reduce the failure rate.
2. Requirements Analysis
Equipment management software is an important intangible asset. As China's manufacturing industry accelerates upgrading and eliminates outdated capacity, manufacturers are moving from labor-intensive operations toward information-driven enterprises. Equipment-management digitization is a foundation of manufacturing informatization: redesigning processes, optimizing rules and embedding them in the system makes management digital, systematic and standardized. This is also a basic condition for intelligent manufacturing. Equipment management affects every aspect of operations, forms an integral part of internal information management and connects production departments in cooperation. Production equipment, power equipment, instruments, transmission equipment and network equipment, together with their selection, purchasing, use, repair, maintenance and modification, are essential to departments and operating activities. Many enterprises have a low level of automated equipment management. After purchasing equipment, they commonly register and archive basic information but lack subsequent maintenance, use, improvement and operating inspections. Yet equipment performance and ease of use directly affect economic benefits and achievement of business objectives.
Traditional equipment management largely relies on manual tracking, records and filing. It is slow, dispersed and difficult to search. Disorganized and complex information creates substantial management difficulties, consumes time and effort and reduces efficiency. An equipment management system brings together equipment registers, management processes, business procedures, standards, methods and practical experience from different industries. It makes operations simpler, more flexible, practical, secure and timely, improves office efficiency and equipment reliability, reduces employee workload and repair costs and raises the level of modern equipment management.
3. Functions
The main functional modules include:
Basic Information Management
Basic information underpins the entire system. To ensure accuracy, consistency and authoritative data, information should be prepared uniformly and entered centrally by the relevant information-department personnel or a designated system administrator.
Organizational Structure
Enter departments associated with equipment management according to the enterprise's departmental information. Build the organization according to management levels, showing superior–subordinate relationships. Enter department codes and names under the coding rules.
Position Management
Enter the enterprise's positions and assign them to the relevant departments.
User Management
Enter user information, assign users to positions and allocate functional permissions.
Permission Management
Allocate functional permissions flexibly to departments or individual users.
Equipment Information
Create organization, workshop and equipment directories. Enter standard equipment classifications and establish classification and numbering procedures for consistent coding, convenient searches and easier management.
Equipment Registers
Record and manage equipment type, brand, specifications, model, technical parameters, purpose, functions, identification number, manufacturer, production date and price. Registers can be classified by organization, workshop, category or status.
Routine and Patrol Inspections
Use mobile devices, phones, PDAs and barcode scanners to inspect equipment under daily, weekly, monthly, quarterly, semiannual and annual plans. Keep the full history of completed patrol tasks to analyze inspection plans and task statistics and identify problems.
Scheduled Servicing
Plan categories include not yet effective, active, expired, plan searches and all plans. Task categories include awaiting execution, awaiting acceptance, accepted and all maintenance tasks. Complete servicing according to plan and create historical records for statistical analysis.
Repair Management
Manage repair requests, requests awaiting assignment or acceptance, all requests and unclaimed requests; also work orders awaiting repair, in progress or awaiting acceptance. Experienced technicians can record repair knowledge in detail for future work and knowledge transfer.
Outsourced Repairs
When equipment cannot be repaired internally, entrust an external organization, complete an outsourced work order and ship the equipment, or arrange on-site service and complete the corresponding order. Evaluate contractors to increase cooperation with good providers and replace unsuitable ones.
Spare Parts
Establish consistent spare-part classification and numbering procedures for convenient searches and management. Inventory functions support searches, issues and warnings. Request statuses are submitted, rejected, awaiting issue, partially issued and fully issued. Issue types include repair, outsourced work, servicing and other uses.
Early Warnings
Set retirement-warning dates according to equipment service-life limits. Define inventory thresholds by equipment type and issue warnings when reached. Generate reminders for upcoming maintenance items, inspections and relevant repair personnel according to plans and tasks.
Statistical Analysis
Calculate equipment serviceability, failure and awaiting-repair rates to produce analytical reports. Analyze spare-part usage to support inventory maintenance. Compare standard labor hours specified in the maintenance manual and determined by equipment complexity with actual hours, establishing repair labor allowances for each complexity factor in third-level servicing, intermediate repairs and overhauls.
Equipment and Spare-Parts Management System Workflow
4. Implementation
Modern enterprises and factories face difficult equipment-information management as equipment becomes complex. By carefully analyzing current practices, previous implementation cases and system functions, and drawing on more than a decade of industry experience, we provide practical, feasible equipment management solutions.
4.1 Current Conditions and Challenges
As equipment costs rise across industries, especially manufacturing, improving utilization and capacity while reducing wear and losses is an important way to lower costs and improve benefits. Enterprises increasingly recognize equipment management as an essential part of organizational management and healthy development.
Enterprises with large, complex equipment fleets, such as power, metallurgy and petrochemicals, face many problems. Technological and information developments bring more complex equipment, more sensors and more detailed management requirements. Effective inspection, repair, checking and management of changing lifecycle conditions are often lacking. Inadequate supervision of utilization, economics and safety reduces transparency in use and operation; frequent unplanned starts can raise operating costs. Nonstandard processes and complicated approvals waste time. Demand for integrated equipment monitoring, management and control is therefore growing.
4.2 Implementation Objectives
- Track assets and equipment easily and accurately, establish a clear dynamic inventory and promptly understand equipment gains and losses.
- Reduce asset, equipment-inventory and spare-part costs, address low utilization, digitize equipment management and allocate assets, equipment and other resources effectively.
- Statistically analyze equipment sources, types and suppliers to support decision-makers.
- Present equipment management system information using icons.
- Inspect equipment according to plan, ensure timely servicing and repairs and achieve the best operating condition during production.
The solution aims to improve the economic performance of equipment operations and help establish a scientifically sound, integrated management framework. Sharing equipment files and maintenance information and circulating repair work orders online saves document-delivery time and improves administrative efficiency, allowing managers to focus more on actual operation and maintenance.
4.3 Detailed Implementation
1. Full Equipment Lifecycle Management
(1) Early-Stage Management
- Equipment selection: compare equipment options and supplier quotations.
- Purchase requisitions: review requests submitted by business or equipment-user departments.
- Purchasing: manage purchase orders and contracts, tracking models, names, descriptions, specifications, quantities, prices and required delivery dates.
- Acceptance: verify incoming equipment against the submitted plan, purchase contract, shipping documents, packing list and factory technical documents, including drawings, inspection certificates, factory-test reports and acceptance-test records.
- Equipment files: create record cards and registers, number each item, define its location and collect basic data and useful technical information, including digital photographs and documents.
- Spare parts: define parts used by each item, create cards and registers and establish equipment-to-part relationships, including types, quantities, economic order quantities and inventory-control methods.
- Failures: compile failure-rate statistics. During early-life failures, identify causes and adjust and improve for stability. During random failures, focus on operator and repair-technician skills and provide regular training. During wear-out failures, strengthen daily maintenance and servicing.
- Maintenance plans: establish a plan for each item, especially key equipment.
- Preventive maintenance: define preventive maintenance for important equipment to minimize unplanned emergency repairs.
(2) Later-Stage Management
- Movement tracking: manage transfers, dispatch for repair, suspended use and retirement, recording the full lifecycle from purchase to disposal.
- Planned maintenance: track the full planned process, including overhauls or refurbishment, intermediate and minor repairs, patrol inspections and lubrication.
- Unplanned maintenance/repairs: track work caused by faults or special conditions, including fault descriptions, location, discoverer, repair process and replacement parts.
- Emergency repairs: establish rapid response and track the process, combining convenient, flexible feedback with rigorous management.
- Failure tracking and analysis: record, obtain feedback on, compile and analyze failure history. Improvements increase serviceability, reduce production impact and lower maintenance and repair costs.
- Spare-parts purchasing: control quantities by actual consumption, economic order quantities and minimum stock. Analyze department requisitions, create purchase orders and track them until every item is received and accepted.
- Spare-parts inventory: track receipts, transfers, issues and returns for all parts, recording and consolidating the complete history.
2. Lubrication Management
Supervise implementation of lubrication rules through five defined elements:
- Points: lubrication locations, names and number of oiling points.
- Quality: the specified lubricant or grease grade for each point.
- Timing: when to add or replace lubricant.
- Quantity: how much to add or replace each time.
- Responsibility: the person responsible for each point.
Requirements:
- Operators and maintenance personnel must follow all five requirements and maintain operating records.
- The technical equipment department must conduct regular inspections and unscheduled spot checks and promptly resolve problems.
- Operators and maintenance personnel must continually watch lubrication conditions throughout the equipment and promptly report and handle problems.
3. Importance of the Equipment Management Database
(1) Lower Inventory and Parts Purchasing Costs
A spare-parts system makes receipts, issues and statistics for tens of thousands of parts manageable. Analysis of consumption and purchasing prices enables more effective buying and lower procurement costs.
(2) Preventive Routine-Maintenance Database
- Operating and maintenance standards protect equipment and operators and provide a training system.
- Well-executed routine maintenance reduces failures, repair expenses and operating costs.
- Well-maintained equipment lasts longer, reducing capital expenditure on replacements.
(3) Repair Database
- A large collection of repair cases forms a knowledge and expert base. It enables analysis such as mean time between failures and mean time to repair, providing accurate references for purchasing.
- Repair-workload statistics support reasonable allocation of maintenance resources.
(4) Higher Equipment Operating Rate
Accurate operation and downtime records make it possible to analyze improvements in operating rate and increase output without adding equipment.
4. Workflows for Selection, Use and Repair Management
(1) Workflow for equipment management, allocation, use, repair and maintenance.
(2) Equipment maintenance management workflow.

(3) Workflow for adding, renewing and modifying equipment.
5. Equipment Technical-Condition Calculations
(1) Equipment Serviceability Rate
This expresses how sound equipment is technically and is an important indicator of equipment management and repair performance.
Equipment serviceability rate = number of serviceable units / total equipment units × 100%.
(2) Equipment Failure Rate
The percentage of equipment operating time represented by downtime caused by failures.
Equipment failure rate = failure downtime / equipment operating time × 100%.
(3) Repair Cost Ratio
Total repair expenditure as a percentage of total production expenditure, an economic indicator of repair efficiency.
Repair cost ratio = total repair expenditure / total production expenditure × 100%.
(4) Average Annual Repair Cost per Equipment Unit
Average annual repair cost per unit = total annual repair expenditure / total equipment units put into use during the year.
5. Implementation Benefits
Implementing the solution reduces workload in equipment and engineering-project management, improves efficiency and work quality and lowers labor costs. Project plans begin at workshop level, are consolidated upward and become executable only after successive approvals. As projects start, finish, submit variation certifications for review and reach settlement, branch-factory planners, construction personnel and estimators enter construction, certification and settlement information online, providing first-hand information to managers. Logs also record originally submitted costs, branch-reviewed costs and settlement amounts, preventing disputes between owners and contractors. Managers and users can monitor progress and settlement at any time. The system controls project quantities and planned spending and requires contractors to build according to plan, helping ensure quality. Preparation occurs before work, supervision during it and review afterward.
The system enables continuous monitoring of equipment conditions and early identification of problems before faults develop. All equipment and engineering projects have unique identifiers and centralized management. Successive approvals reduce maintenance expenditure and close management gaps, avoiding omitted project items, unplanned construction and work beyond plan. Equipment and project expenses are effectively controlled, saving human, material and financial resources and producing notable social benefits.
6. Operating Environment Stated in the Original Specification
Database server: PVI3000/1G/4x36G/1000/100M/15".
WEB server: PVI3000/2G/2x36G/1000/100M/15".
PC terminal: PIII700/128K/10G/100/10M/15", WIN98/2000.
Database platform: enterprise databases such as ORACLE, SQLSERVER and SYBASE.
Server operating system: WIN2000SERVER.
The solution applies to equipment management in government organizations, factories, mines, enterprises and institutions. It supports comprehensive deployment of an equipment management platform. Users can efficiently manage registers, routine and patrol inspections, lubrication, servicing, repairs, transfers, loans, returns, spare-part renewal and retirement; analyze and compile overall equipment efficiency scientifically and effectively; and track the entire lifecycle. This helps improve operating efficiency, reduce failures, increase equipment-management efficiency and ultimately raise overall production efficiency.