Flagship AI-ESOP
Electronic work instructions E-SOP
Replace paper SOPs with a digital shop-floor hub that combines moving images, spoken guidance and records. A single screen brings together process documents, work instruction videos, first-article confirmation, Andon calls and data acquisition, reducing changeovers from half an hour to three minutes and making every operation traceable.
What are E-SOP electronic work instructions?
ZEVON Industrial Technology's E-SOP electronic work instruction system replaces paper SOPs with industrial all-in-one computers, turning process documents into digital work instructions that can show motion, provide audio and record information. It covers 200 functions, works offline, does not tie users to specific hardware, and can connect to MES and ERP systems. It draws on thirty-three years of manufacturing experience and serves 1.2 million customers.
Content updated: 2026-11-10
- Functional scope Documents and versions, distribution and changeovers, terminals and displays, organization and permissions, integration and interfaces, quality and shop-floor operations, content and training, hardware and maintenance: 200 features in total
- Works offline SOPs are cached locally on terminals, allowing playback and confirmations to continue offline. Records are uploaded automatically when connectivity returns.
- No hardware bundling All-in-one computers, tablets and player boxes running Android 7.0 or later can be used, subject to compatibility testing.
- Integration capabilities Standard RESTful APIs, intermediate tables, database views and file exchange; integrations have been implemented with SAP, Yonyou, Kingdee, Digiwin, Pangu and Morewis.
- Deployment schedule About 30 days for up to 50 workstations; 60–90 days for 200; more than 90 days for multiple sites or deep integration
- Workshop network Primarily industrial WiFi 6 APs, with coverage of 150–250 m² per AP and roaming handover below 100 ms
On the shop floor,Still struggling with paper documents putting out fires repeatedly?
The problem with paper work instructions is the continuing cost they impose on profit, yield and delivery performance. If three or more of the following seven situations apply, paper SOPs have become a bottleneck to production capacity.
Versions never match.
Engineering has revised the drawing and process engineers have changed parameters, but the workshop wall still displays the previous version. Who changed it, when it takes effect and which workstations are affected must all be confirmed individually by phone.
Documents become damaged, lost or difficult to trace.
Repeated exposure to oil, water and perspiration leaves documents curled and yellow within a month. Replaced versions are stuffed into drawers and cannot be found when an audit requires them.
The production line waits while staff find changeover documents
A production line changes product models five times a day. Each time, staff search filing cabinets for the relevant SOPs for more than twenty minutes while the line waits idle.
Printing costs are difficult to track.
One set of documents for each product model becomes thousands of paper sheets across hundreds of workstations. Color printing, lamination and mounting recur year after year, with substantial costs even before staff time for organizing the documents is included.
Paper cannot explain everything clearly; new employees rely on experienced workers
A sheet of A4 paper cannot adequately show the sequence of assembly movements, required force, angle specifications or clip orientation. Experienced workers can get it right by feel, while new employees must repeatedly learn by trial and error, extending training to two or three weeks. Staff turnover then affects yield. More difficult still, when a problem occurs there may be no evidence that the standard was followed at the time.
First-article confirmation lacks a complete evidence trail.
Paper first-article sign-off sheets may be completed retrospectively or signed by someone else, leaving no reliable record of whether the check occurred, who performed it or when. Detailed customer audits then expose the lack of trustworthy evidence.
Training and actual job performance remain disconnected
HR holds the training records, while team leaders judge practical skills. No one can clearly identify who is qualified for each workstation or when their qualifications expire.
From a sheet of paper,into a digital hub
SOPs (Standard Operating Procedures) have evolved through three generations on the shop floor. Most factories remain at the first generation, while some have reached the second. The third generation creates the real competitive difference.
Paper SOPs · Posted on the wall
Lay out documents in Word or Excel, print them, laminate and mount them, and hang them at workstations. The entry barrier is minimal, but versions are uncontrolled, updates rely on staff traveling between workstations, content is static and problems cannot be traced—Documents are static; the shop floor is dynamic.。
Electronic dashboards · Put paper on screen
All-in-one computers or industrial televisions replace paper documents, displaying SOP images and PDFs clearly without paper damage. However, this remains fundamentally Put static files on screens: Changeovers depend on people finding files, and version checks depend on individual judgment.
The workshop's digital hub · Dynamic work standards
Upgrade SOPs from files to a system: images, PDFs, video, 3D and multiple languages; automatic changeovers triggered by barcode scans; mandatory task confirmation and electronic signatures; one-click Andon alerts for exceptions; and data sent back to MES. The screen becomes Workstation interface for operation, records and data。
33 years of manufacturing understanding, delivered through one screen
Founded in 1993, serving 1.2 million customers. We have seen too many systems installed but unused—the problem is often not a lack of features, but Not aligned with shop-floor operations: how to operate the screen while wearing gloves, what to do when the network disconnects, and how to handle a changeover window of only three minutes.
Product features:Paperless workshop: digitizing a process sheet
ESOP system = paperless shop floor + SOP electronic work instructions + shop-floor document management + shop-floor drawing management. Turn workshop documents into actionable work standards.
Introduction: Why workshops need to replace paper SOPs
As competition intensifies, information technology advances, prices increase and labor and other costs rise, more effective production management and cost control on shop-floor production lines have become central manufacturing concerns. Traditional production-line management presents many problems: printed documents take up space and are easily lost; manual distribution can leave documents incomplete or incorrect, with inconsistent versions and low efficiency; toner, paper and manual checking are costly, while product changeovers and SOP revisions require substantial work; version control, distribution and replacement are complicated and prone to error; paper can go missing, become dirty or damaged, or be marked up informally, potentially misleading operators; and the shop floor is difficult to keep orderly and professional, preventing paperless frontline operations.
What is ESOP?
ESOP uses suitable document formats to describe the steps operators must follow and the precautions they must observe during production. It serves as work instructions for operators and as a basis for managers to inspect and guide work. ZEVON Industrial Technology developed E-SOP specifically for electronic management of process cards on the production floor, with paperless operations as its core concept. It supports approval, management and distribution of electronic work instructions and displays images, Word, Excel, PowerPoint, video and animation files, helping accelerate line changeovers and improve the factory's presentation. The system also integrates Andon calls, real-time production data management, equipment inspections and ESD monitoring to support an efficient, high-quality and cost-effective smart factory.
Eight roles it plays in the workshop
- A training manual helps new employees learn effective working methods quickly.
- A foundation for production quality improvement: record and analyze the entire process using PDCA.
- Introduce management tools to implement 6S, line balancing, visual management, Kanban and rapid changeovers.
- Promote technology transfer by bringing new technical concepts directly to workstations through work instructions.
- Reduce costs and improve efficiency by using system analysis to identify the causes of rising costs.
- Encourage employees to think proactively, report impractical operations and support continuous improvement.
- Express corporate culture and execution capability; send quality and hazard information directly to workstations
- A tool for implementing enterprise strategic objectives and laying the foundation for intelligent operations
System advantages (7)
- Improve the company's image through electronic management and better shop-floor 6S practices
- Save enterprise resources: go paperless, benefit from a one-time investment over the long term, and reduce changeover labor time.
- Efficient and stable operation: high-specification hardware meets electronic SOP requirements.
- Unified terminal management: centralized dispatch with separate display settings for each process
- Multiple file formats: images, Word, Excel, PowerPoint, audio, video and high-definition video.
- Customized software functions developed for actual enterprise requirements.
- Management-function expansion: compatible with production dashboards, Andon, ESD and MES
System benefits (5)
- SOP document management, review, publication, push notifications, video management, and automatic uploading and assignment.
- Paperless workshop: production documents, assembly drawings, packaging drawings, QC engineering drawings, equipment operating manuals, testing instructions, reference tables, specification documents and standards for handling exceptions
- Digitize record forms: equipment inspection checklists, quality-inspection forms, statistical-data sheets and production-reporting forms
- System integration: ERP, PLM, PDM, MES, WMS
- Digital workshop management: ESD monitoring, Andon alerts, workstation material calls, workstation communication and product traceability
13 major functions
- Improve quality and productivity and increase system completion rates
- Shorter operation times and a steadier production rhythm
- Align quality objectives with a single standard
- Mandatory standards, electronic review and controlled management
- Visual work, dynamic and process analysis
- Unified, concise, prominent and practical visual management
- Communication and coordination across departments and specialist functions
- Improve corporate presentation
- Paperless workshop management
- Visual shop-floor management
- Lean, just-in-time and visual workshop management
- Reduce changeover times from minutes to seconds
- File versions are 100% controlled and traceable.
9 key benefits
- Eliminate changeover labor time and release production capacity directly
- Eliminate paper, toner and printing-consumable costs.
- One authoritative version substantially reduces wrong-version use and rework.
- Faster onboarding and shorter training cycles
- Tidier work areas and improved customer factory audit pass rates.
- Process changes take effect the same day without passing through multiple layers.
- Faster exception response and shorter line stoppages
- Accessible data provides evidence for improvement
- Turn management practices into standards that can be replicated at new factories.
Also helps reduce the eight forms of waste.
- Management waste
- Waste from defect correction
- Transportation waste
- Waiting waste in industrial operations
- Delayed updates lead to excessive manufacturing waste and more defective products.
- Differences in management practices between departments are difficult to eliminate
- Large numbers of SOPs require regular review and revision.
- The cumbersome process of SOP printing, copying and distribution
- Manage the issue and retrieval of drawings and process documents.
Consider the calculation: 200 workstations, 2 changeovers per day, 15 minutes each
This illustrative calculation assumes 30 operating days per month and 12 months per year. Hours are aggregated across workstations, rather than representing calendar downtime of a single production line. Actual benefits require on-site measurement.
Paper consumption
200 × 2 per day = 400 sheets of A4 paper; per month, 400 × 30 = 12,000 sheets; approximately per year 144,000 sheets. Add toner, printer maintenance and manual checks, and the costs keep mounting.
Changeover labor time
Per day, 200 × 2 × 15 = 6,000 minutes; 180,000 minutes per month ≈ 3,000 hours; per year ≈ 36,000 hours While a line is stopped for changeover, it produces nothing.
After switching to E-SOP
One-tap changeover takes approximately 30 seconds, based on 400 changeovers per day, saving approximately 5,800 minutes; paper is eliminated, a single authoritative version is maintained, and changing products or document versions requires no additional consumables.
ZEVON ESOP 22.5 standard functions, 2026 edition · 200 features
Android touch all-in-one computers include five software components with permanent free use and upgrades: server software, PC management software, smartphone software, iPad software and terminal software. Integration with WeChat, DingTalk and similar services is available at additional cost. The following 200 features are organized into 8 categories of 25 features each.
01Documents and versions25 items
- SOP document management
- Approval workflow management with sequential sign-off
- SOP work-instruction version management
- Controlled issue and retrieval registration
- Standard SOP stamping and approval
- Document management: 12 quick-open buttons, supporting more than 40 formats
- Drawing management: CAD and 3D files
- View engineering documentation
- View WI quality documents
- Document search system
- Batch SOP upload and code matching
- Quickly duplicate SOPs.
- Quick template duplication
- Automatically convert Excel to high-resolution, non-editable PDF.
- Document validity periods and expiry reminders
- Change orders and version-difference comparison
- Electronic seals and cross-page seals
- View linked drawings and BOMs
- Parallel multilingual SOPs: Chinese, English, Japanese and Vietnamese
- Link attachments and videos to processes.
- Automatically withdraw obsolete documents.
- Historical-version archiving and traceability
- Print tracking and watermarks; optional
- Document permissions down to field level
- Full-text fuzzy search across documents and drawings
02Dispatch and changeover25 items
- Create processes, operations and routes
- Custom workstation page numbers
- Dispatch SOPs by process route.
- Distribute non-standard SOPs without binding them to workstations.
- Dispatch to multiple or individual sections
- 16 combinations for line and product-model changeovers
- Pre-staged and delayed changeovers
- Trigger changeover at a scheduled time.
- Slideshow intervals of 5 seconds, 10 seconds or a custom duration
- Page-level viewing permissions: control how many pages may be viewed
- DIY fuzzy-search changeover on all-in-one computers.
- One-tap mobile changeover: 1 second for the entire line
- One-click changeover from a management PC
- Server-side changeover
- Changeovers using iPad tablets
- Barcode-scanner changeover: 1D and 2D codes
- Mobile barcode-scanning changeover
- Changeover through PDA entry or barcode scanning
- SOP changeover through fuzzy search
- Voice-triggered changeover, requiring external network connectivity
- Standalone offline changeover for network outages
- Integrate with ERP, MES, WMS and APS for automatic changeovers
- Changeover by mold number for injection molding and metalworking
- Before-and-after changeover comparison and error-proofing checks
- Changeover records and labor-time statistics
03Terminals and displays25 items
- Production-line terminal content management
- Preview terminal SOPs from the management interface
- Custom all-in-one terminal button management
- Custom functions: slideshows, startup on boot, menus and barcodes
- Automatic startup and full-screen dashboards
- Single- and multi-page display using touch or a scroll wheel
- Automatic and manual display switching
- Workstation screensavers and scheduled screen-off
- Automatic portrait and landscape adaptation
- Adjust font size and contrast by workstation.
- Playback of images, Office files, PDFs, video and 3D content
- Scheduled video playback
- Scheduled video pop-up advertising
- Scrolling announcement at the top
- Push mobile announcements as pop-ups on all-in-one terminals
- Knowledge base search on all-in-one terminals
- All-in-one terminal login by face recognition or card
- Local caching for offline playback
- Synchronize multiple displays on one line
- Display grouping and bulk configuration
- Remote screenshots and status inspections
- Remote restart, shutdown and upgrade
- Terminal online/offline status dashboard
- Adaptive resolution for 18.5- to 32-inch screens
- Separate controller-and-monitor solution, with some functions unsupported
04Organization and permissions25 items
- Employee personnel-record management
- Workshop and assembly-line information management
- Create product-code information records.
- Employee training and skills-material management
- Personnel lookup: skills, resumes and profile photos
- Performance assessment scoring
- Permission management and multilevel information push
- Field-level and group-level permissions
- Role templates: IE, PE, line leaders and operators
- Login by employee number and password, card, face recognition or RFID
- Domain accounts and single sign-on, optional
- Operation logs and login duration records
- Automatic logout after 12 hours for shift-change login
- Additional authorization for sensitive operations
- Data isolation by workshop and production line
- Approval delegation and delegated signing
- Bulk account import and deactivation
- Multi-factory, multi-workshop organizational structure
- Workstation skills matrix
- Warnings preventing untrained personnel from starting work
- Training attendance and test records
- Employees independently view SOPs for their own workstation.
- In-system, WeChat, DingTalk and SMS notifications
- Permission-change logs and audit trails
- Read-only demonstration mode for customer visits
05Integration and interfaces25 items
- MES integration
- ERP integration
- Office-automation system integration
- APS integration
- WMS integration
- PLM integration
- PDM integration
- Standard ESOP-API interface
- Look up BOMs and inventory by part number
- Warehouse inventory lookup
- Basic APS production scheduling
- Dispatch linked to production plans, advanced edition
- Order management, advanced edition
- Lightweight MES-level ESOP, requiring supporting scheduling
- Mixed distribution to WinSOP and Android SOP terminals.
- Integration with ESD monitoring
- Factory digital public-address system integration
- Andon system integration
- Integration with SMT and other systems; advanced edition.
- Multiple servers with separate database and web services
- Cloud-based SOP management on Alibaba Cloud
- WeChat and DingTalk messages and approvals
- Synchronization tasks and retry on failure
- Interface logs and reconciliation reports
- Development interfaces and custom fields
06Quality and shop-floor operations25 items
- Software Andon system: reporting, handling and feedback.
- Custom Andon buttons
- One-to-one calls and factory-wide broadcasts
- USB-programmable multi-tier signal lights
- Alerts sent to wristbands and watches by vibration
- Push to mobile apps on Android and iPhone
- Push to SMS, WeChat, DingTalk and management PCs
- Push to Andon dashboard televisions
- Quick responses from called personnel
- Feedback pop-up notifications for the caller
- Andon call reports
- Call logs and timestamp traceability
- Mobile equipment inspection, patrol inspection and first-article inspection
- Shared-Excel equipment and patrol inspections
- Digital equipment-inspection checklists
- Quality inspection and statistical data sheets
- Digital production-report forms
- Archive photos and videos of critical processes.
- Record SOP videos on a phone and upload them immediately.
- Compare videos of correct and incorrect operations
- Quality traceability with video and batch records
- Exception alerts on phones and tablets
- First-article confirmation and release
- Defect records and cause classification
- ESD monitoring integration
07Content and training25 items
- Enterprise knowledge library with fuzzy search
- Advanced knowledge base with electronic seals and internal/external network access
- Promotional content management
- Training video and course-material management
- Operation-specific onboarding manuals
- Training materials combining images, text, video and 3D
- Highlight process essentials and error-prone points.
- Display standard work times and cycle times.
- Short-break music, MP3
- Video broadcasts at customizable times
- Factory voice announcements
- Multilingual interface switching
- Visual templates with colors and icons
- 6S dashboards and area identification
- Dedicated safety operating procedures
- Emergency plans and evacuation guidance
- Customer visit presentation mode
- Corporate video carousel
- Improvement proposal and suggestion submission
- Question bank and online assessments
- Training attendance and learning-hour statistics
- Skills certification expiry reminders
- Training-material versions and applicability
- Content review and publication calendar
- SOP usage statistics
08Hardware and operations25 items
- Android touchscreen all-in-one computers, 18.5 to 32 inches.
- Rear clips, wall mounts, cantilever arms and assembly-line brackets
- Separate controller-and-monitor solution
- Selection and placement of industrial Wi-Fi 6 access points.
- Windows 10 or Windows Server 2019; existing PCs can be used.
- Server deployment and commissioning in 40 minutes
- Hardware and network installation: 1–3 days
- All-in-one terminals delivered nationwide within 1–3 days
- Hardware and software encryption with MAC-address binding
- Continue viewing ESOP and videos when offline.
- Local caching and resumable transfers after disconnection
- Automatic backups and one-click restoration
- Batch terminal upgrades
- Remote operations, maintenance and service tickets
- System-health inspections and alerts
- Storage capacity and cleanup policies
- License management
- Lifetime free upgrades for five software clients
- Server migration and disaster-recovery drills
- Operating manuals and video tutorials
- 1 hour of on-site training
- 7×12 remote support
- Staged upgrades without disrupting production
- Unified deployment templates for multiple factories
- Acceptance checklist and go-live checklist
Items marked as separately charged or partially unsupported reflect optional modules and differences between specific hardware combinations. The selected configuration proposal determines availability.
Advanced edition: directly links production plans and automatically distributes ESOP content
- Production-plan linking
- Order management
- Advanced ESOP functions
- Integration with more than 10 advanced software systems, including SMT systems.
- More than 40 MES expansion modules
- Mobile
- Installation support for older Windows computers
- Main ESOP Functions
Experience serving companies including Star-net Ruijie Networks, part of a group under the state-owned assets regulator.
Specialized approaches for CNC, metalworking and injection molding
- Establish the relationship between mold numbers and document numbers.
- Upload the SOP for each mold and link it to the mold number.
- Enter a mold number on the all-in-one terminal to retrieve the SOP immediately, with fuzzy search and automatic suggestions—workers manage changeovers themselves.
- If each injection-molding machine uses one mold for a long period, treat each machine as a production line. IE/PE distributes the SOP, and workers need not take action.
- The all-in-one terminal automatically signs out after 12 hours of operation. The next-shift operator signs in with an employee ID, and the backend records login duration.
Once master data is established, switch lines in one second by changing the mold number.
16 currently supported changeover methods
- The all-in-one terminal's Changeover button supports configurable fuzzy searches by material code (matching the SOP code), or selection of an operation from a drop-down list after searching a finished-product code. This function is unavailable on a player box with a separate display.
- One-touch changeover on mobile: enter the SOP code to switch the entire designated line in 1 second. Suitable for line leaders, team leaders and managers.
- One-click line changeover from a management PC: IE, PE or engineering staff select the production line using an existing Windows computer.
- Server-side changeover
- Changeover from an iPad tablet for managers.
- Pre-changeover and delayed changeover: immediate changeover at the line head, delayed changeover at the line end, taking effect after the employee taps Changeover
- Slideshow: server-controlled 5-second, 10-second or custom intervals
- Trigger changeover at a scheduled time; this function is unavailable with a box-and-display setup.
- Assign permissions by page; administrators specify whether one or several pages can be viewed
- Automatic changeover based on ERP orders, MES work-order numbers, WMS and APS integration, charged separately
- Barcode-scanner changeover using barcodes or QR codes
- Mobile scanning for changeover: barcodes and QR codes
- Changeover through PDA entry or barcode scanning
- SOP changeover through fuzzy search
- Voice-activated changeover requires internet access and specific conditions.
- Standalone offline changeover when network connectivity is unexpectedly unavailable.
Mobile, management-PC, server, tablet and terminal interfaces all have strict permission controls at field and Microsoft group levels.
ZEVON Andon calls, 2026 edition
- Custom Andon buttons
- Customize call recipients for one-to-one calls.
- Push voice announcements to the broadcast center, with factory-wide calls also supported.
- Push notifications to warning lights with hundreds of thousands of colors, four customizable color layers, a USB interface, flashing/rotating effects and an adjustable buzzer
- Push to wristbands and watches: text, sound and vibration
- Push notifications to Android and iOS mobile apps, with text, audible alerts and vibration.
- Push SMS, WeChat, DingTalk and Toutiao messages, and send them to terminal-management PCs.
- Push to Andon dashboard televisions
- Called personnel can respond promptly and provide handling feedback
- Senders can receive feedback pop-ups
- Call reports trace event-trigger and handling timestamps.
- Call logs
Detailed function description:
Twelve modules supporting one workstation
The following twelve modules are organized around the real workflow of where documents originate, how they reach workstations, how operators use them and how data returns. Each module corresponds to an actual workshop scenario, rather than simply forming a list of functions.
01 · Complete SOP document lifecycle management
From creation to withdrawal, a work instruction passes through Drafting, review, approval, publication, revision and withdrawal There are six states. In the paper-based era, signatures and folders held the process together, making control difficult as operations grew. E-SOP embeds the entire workflow in the system: process engineers create documents in the backend and specify the applicable products, workstations and operations. After submission, documents follow a predefined approval workflow to process, quality and production supervisors. Once approved, the system automatically generates a version number, sets an effective time and pushes the document to the corresponding workstation screens when that time arrives.
When documents are revised, the system retains a complete version history, allowing any version to be reviewed, compared or restored. Obsolete documents are marked as obsolete and removed from workstation displays rather than disappearing. During audits, users can still identify which version a particular workstation displayed on a particular date. This is especially important in customer factory audits and management system audits, including IATF 16949 and ISO 9001. Document control becomes more than a slogan: it becomes exportable system records。
Rich content in multiple formats
Supports JPG and PNG images, PDF documents, MP4 work instruction videos, animated GIFs, 3D models in glTF and OBJ formats, Office documents and web links.
An SOP can be divided into multiple step pages, presenting images, text and video one page at a time. Workers swipe left or right to follow each step, offering much greater clarity than a densely packed sheet of A4 paper.
Playback on workstation terminals
Supports Android all-in-one terminals, Windows industrial PCs, industrial tablets, industrial televisions and even standard smart-TV boxes. The same content automatically adapts to landscape or portrait orientation and large or small screens.
Terminals automatically enter full-screen playback on startup, hiding the desktop and browser address bar. Operators cannot exit the application or install software, preventing workstation screens from becoming devices for watching unrelated videos.
Changeover in seconds
During changeovers, scan a work-order barcode, product barcode or workstation card. The system identifies the current product model and switches the complete SOP set to the corresponding version within 0.8 seconds.
It can also integrate with MES/APS so that issuing a work order triggers automatic switching, or link with PLCs so screens change when equipment programs switch. Choose among three methods according to site conditions.
Electronic signatures and first-article confirmation
Critical operations can require confirmation before continuing. After completing a step, the operator confirms it, and the system records employee ID, time, workstation and SOP version.
Electronic signatures using passwords, cards, fingerprints or facial recognition are supported for first-article inspection, first articles after changeover and parameter setting. They form a tamper-resistant evidence chain that can be exported directly for customer factory audits.
Andon calls and abnormality reporting
Workstations provide five one-touch call categories: material shortage, quality, equipment, process and other. Team leaders' phones, workshop dashboards and public-address systems receive the call simultaneously, while response time is recorded automatically.
After resolving an exception, users enter the cause and corrective measures, creating a basis for improvement. Reports clearly show the most frequent exception types and the workstations generating the most calls.
Workstation material calls and error proofing
Operators report material shortages with one touch; the warehouse or AGV receives a delivery task. With pick-to-light, the corresponding rack location illuminates, and an incorrect pick triggers an alarm.
When materials are scanned for loading, the system checks whether they belong to the current product model and blocks mismatches, preventing wrong-material use and mixing at the source.
Data acquisition and equipment connectivity
Three data-capture methods are supported: scanning barcodes, QR codes or RFID; networked equipment acquisition through OPC UA, Modbus TCP, MQTT or direct PLC connections; and manual entry.
Production quantity, good and defective counts, equipment status and process parameters are automatically returned to provide real MES/OEE data, replacing handwritten end-of-shift reports.
Electronic dashboards and information publishing
The same screen becomes a production dashboard when idle, displaying output progress, yield trends, OEE, Andon status, announcements, company information and safety reminders.
Supports split-screen layouts, with SOPs on the left and data on the right. Workers can see current output while viewing work instructions, and managers passing by can identify abnormalities at a glance.
Training and job qualifications
SOPs can be used directly as training materials. Workers learn on terminals, watch videos and take online examinations. After they pass, the system automatically grants qualification for the relevant workstation.
A person-by-workstation qualification matrix shows who is qualified, whose qualification is nearing expiry and who needs refresher training. During scheduling, the system can directly verify whether a person is qualified for the assigned workstation.
Permissions and auditing
Multidimensional authorization by role—process engineering, quality, production, equipment or management—department, workstation and product line clearly defines who may view, edit or publish content.
All operations are logged: who did what to which document, when, and from which IP address. Employee-ID and time watermarks help prevent unauthorized sharing through photographs, while screenshots can be disabled for sensitive documents.
Mobile and remote management
Managers can use their phones to approve documents, view each workstation's online status, receive Andon alerts and monitor real-time output.
Across multiple factories, headquarters centrally manages SOP versions for all sites while delegating permissions by factory where needed, combining consistent governance with flexibility.
Beyond one screen: coverage across all terminals
A workshop never has just one type of screen: assembly lines may use 21.5-inch portrait all-in-one computers, inspection stations may have only 10-inch tablets, a 55-inch television may hang in the center of the workshop, and a 7-inch display may be embedded beside a machine. The E-SOP player provides Responsive adaptation: The same SOP presents images and text side by side on a large screen, switches automatically to vertical scrolling on a small screen, and rearranges step cards automatically on a portrait display.
This means a factory does not need to standardize all its hardware before adopting the system. Existing Android all-in-one terminals can be used, as can newly purchased Windows industrial PCs. Even a standard television with an Android box can serve as a temporary terminal. Freedom from hardware bundling is a principle stated in our quotations.—select equipment for the on-site conditions; the software ensures it can all run.
Terminal management is also centralized: the backend shows each terminal's online/offline status, current content, last heartbeat time and software version. Firmware updates, content distribution and remote restarts can all be performed with one click, without operating each terminal individually.
Technical framework:Distributed architecture that scales with operational requirements
From small factories with dozens of workstations to multi-site groups with tens of thousands, the same system can scale without replacing its architecture. The following explains its technical foundation layer by layer, so you can understand where each part of your investment goes when selecting a system.
Server and terminals: hybrid browser/server and client/server architecture.
The management interface uses browser/server architecture.Process engineers log in to the administration system through a browser to create documents, run approvals, assign permissions and view reports, without installing a client on every computer. The process department can work normally using a temporarily borrowed computer or editing documents from home after hours.
Playback terminals use a client/server architecture.Workstation terminals run a native player application—an Android APK or Windows EXE—rather than simply opening a URL in a browser. The reasons are practical: browsers can be closed accidentally, the address bar can interfere with operation, network loss can produce a blank screen, and extended running can cause memory leaks. The native application starts on boot, locks into full-screen mode, plays locally when offline and automatically recovers memory. A terminal can run continuously for a year without manual intervention.
The server supports Windows Server 2012 or later and CentOS / Kylin / UnionTech and other domestic Chinese computing environments. Database support includes SQL Server 2012+ and MySQL 5.7+, and can be installed in the factory's own server room or deployed to a private cloud. For customers requiring domestic IT compatibility in China, we provide a complete localization and compatibility solution.
File services: the real bottleneck for SOP videos and drawings
Many people assume the database is E-SOP's performance bottleneck. In fact, what really consumes bandwidth and storage is Files: One product model's SOP may contain dozens of high-resolution images, several work-instruction videos and a 3D model, totaling tens to hundreds of megabytes. If these files share a server with the database, simultaneous downloads from hundreds of workstations can immediately saturate the network.
We therefore separate file services and build them as Horizontally scalable distributed file nodes. If one file server cannot support the load, a second and third can be added. The system automatically distributes storage by file hash, while the access layer routes terminal requests to the nearest node. Combined with local terminal caching, each file is downloaded only once per workstation and is read locally thereafter.
More crucially,Preloading strategy: Based on the current work order and production schedule, the system sends the next product model's SOP to the relevant workstation terminals in advance. When the actual changeover takes place, the files are already stored locally: switching is completed in seconds instead of waiting for downloads.
Communication protocol matrix
HTTP/HTTPS For routine data exchange;WebSocket For terminal online status and real-time message push, including changeover instructions, Andon alerts and announcements, with latency within 200 ms;MQTT Used for equipment data reporting in low-bandwidth IoT applications;OPC UA / Modbus TCP For direct connections to PLCs, injection-molding machines, SMT placement machines, CNC equipment and other devices.
Choose protocols for actual site conditions rather than simply selecting the newest. Add a serial gateway for older equipment with only RS232; connect directly when newer equipment supports OPC UA.
Integration methods for existing systems
API integration Recommended: exchange work orders, materials, personnel and output data with MES and ERP systems through standard RESTful interfaces;Intermediate tables: create agreed tables in the other system's database and read or write them on a schedule, suitable for legacy systems without open interfaces;Database views: Read-only data access carries the lowest risk;File exchange: scheduled CSV/XML file exchange, suitable for connections across network segments.
The four methods can be combined. The most complex implementation we have delivered connected the same production line to MES systems from 3 different suppliers and 1 ERP system simultaneously.
High availability and disaster recovery
Application service support Dual-server hot standby, with automatic failover within 30 seconds if the primary node fails. Database support includes Primary–replica replication, with replica databases handling reporting-query workloads. File services support Multiple replicas, so failure of a single node does not interrupt access. The system performs automatic full backups daily and incremental backups in real time; backup files can be stored off-site.
For production lines with extremely high continuity requirements, deploy Local edge node: Even if the network between the equipment room and the workshop is interrupted, changeovers, playback and data acquisition can continue normally within the workshop.
Security framework
Mandatory transport-layer HTTPS/TLS 1.2+, sensitive fields such as passwords and employee numbers AES-256 Encrypted storage; the permission model uses RBAC + data scope Two layers of control; all key operations are written to Immutable audit logs; screen display Employee-ID + time watermarks, enabling traceability when photographs are shared externally; sensitive documents can enable Block screenshots and Delete after reading。
The system meets China's Level 2 classified cybersecurity protection requirements; security-assessment materials are available on request.
Typical performance metrics
| Metric | Standard configuration | Notes |
|---|---|---|
| Concurrent terminal count | 500 terminals per node; clusters scale to tens of thousands | Estimated using an application server with 8 cores and 16G memory |
| Line changeover response | ≤ 1 second on a local cache hit | ≤ 3 seconds without preloading |
| Publish documents to terminals. | ≤ 5 seconds for up to 100 terminals | Push delivery through WebSocket. |
| Andon alarm delivery | ≤ 500 milliseconds | From terminal to team leader's phone |
| Local caching on individual terminals | 8–64 GB, configurable | Offline playback supports approximately 30 days of usage. |
| File-service capacity expansion | Add nodes online without downtime. | Automatic redistribution by hash |
| Data retention | Business data retained permanently; logs retained for ≥ 3 years | Retention can be extended to meet compliance requirements |
Workshop network topology:Wi-Fi is the main connection; access-point quality is decisive.
This is a standard workshop network topology: the core switch is in the equipment room, aggregation switches are deployed by workshop, and industrial-grade WiFi6 APs cover workstations at the access layer. All-in-one terminals connect wirelessly and are ready to use when powered on. Add a network cable for large displays requiring greater stability or workstations with strong interference. The following four cards explain how to select APs and position them.
Three-layer topology: keep traffic where it belongs
Core layer Located in the equipment room, this layer houses the core switch and servers and handles routing between network segments and external connectivity. Stability is the priority; elaborate configuration is unnecessary.
Aggregation layer Organized by workshop or floor, each aggregation switch connects dozens of access switches. This layer handles VLAN termination, QoS policies and access control. Production, office, surveillance and equipment networks are separated here to avoid interference: a large file download in the office must not affect a production line changeover.
Access layer These are the industrial switches and wireless APs inside the workshop. They must resist interference and vibration and operate over a wide temperature range. Ordinary commercial switches cannot withstand even one summer in a stamping workshop. We recommend industrial-grade switches rated for -20°C to 70°C, with DIN-rail mounting and redundant dual power supplies.
Between the three layers, use Fiber optics Interconnection uses single-mode or multimode fiber depending on distance; connections from the access layer to terminals use Category 5e or Category 6 Ethernet cable; use fiber when distances exceed 90 meters. All switches are recommended to support PoE, allowing all-in-one terminals to be powered directly through network cables, eliminating one power cable and one potential workshop hazard.
Primarily Wi-Fi: access-point selection determines whether operation is smooth.
Most workshop terminals connect over Wi-Fi.All-in-one computers require no additional network cabling, cable-tray space or production-line modifications, minimizing retrofit work. With suitable AP locations and channel planning, SOP viewing, video switching and changeover confirmation run smoothly.
Consider three factors when selecting access points:① Use industrial- or enterprise-grade Wi-Fi 6 access points supporting 802.11ax and dual-band 2.4G/5G. ② Each access point covers 150–250 m² and supports 30–50 all-in-one terminals; deployment should follow workstation density, with additional access points in steel-structure factories or heavily partitioned areas. ③ Support fast roaming with handover below 100 ms, centralized AC or cloud management, and automatic co-channel avoidance.
Implementation recommendation:Give the production network its own SSID and VLAN. Use the 5 GHz band for video content. Provide wired Ethernet backup for 32-inch displays, video-intensive applications or workstations with strong interference, such as stamping, injection molding and welding. Using household routers to support a workshop creates reliability risks rather than real savings.
Offline mode: keep the line running during network outages.
This is E-SOP's most underestimated capability. Workshop networks cannot be 100% reliable: a switch restart, fiber cable crushed by a forklift or equipment-room power outage can bring an entire line to a halt.
Our terminals consistently use Local-first operation: SOP files are cached locally on terminals in advance. Even when completely disconnected from the server, workers can still view SOPs, confirm tasks and collect data. Data is stored locally and, when the network is restored,Automatic upload recovery, without losing a single record.
When disconnected, the terminal displays an offline indicator in the upper-right corner. Managers can see which terminals are offline and for how long. Synchronization resumes automatically when connectivity returns, without manual intervention.
VLAN segmentation and QoS
Typical segmentation:VLAN 10 servers,VLAN 20 production terminals,VLAN 30 office,VLAN 40 Equipment networks (PLCs/robots),VLAN 50 Video surveillance,VLAN 60 Wireless.
QoS policies mark SOP video streams, changeover commands and Andon alerts as high priority and office traffic as low priority, protecting production lines first when bandwidth is constrained.
The equipment network must be isolated from the production terminal network, allowing only one-way access by data acquisition services to specified ports. This is a basic safeguard against one infected computer disabling an entire production line.
Cross-site and international deployment
Multiple factories in one city:Connect sites through dedicated lines or SD-WAN. Deploy the main service at headquarters and edge nodes at each factory so SOPs are distributed locally.
Across provinces or countries:Headquarters centrally manages documents and versions, while each factory independently deploys edge services. Files synchronize on demand, avoiding unnecessary WAN bandwidth use. In international deployments, edge nodes can operate independently and transmit only aggregated data back to headquarters.
Customers with factories in Vietnam, India and Mexico use this architecture. Headquarters revises one SOP version, and each site activates it according to schedule. Time-zone differences and network conditions are no longer obstacles.
Bandwidth and capacity estimates based on 200 workstations and one 8-hour shift
| Scenario | Traffic per terminal | Peak load for 200 workstations | Recommendation |
|---|---|---|---|
| Routine playback using locally cached content | ≈ 0, heartbeat traffic only | < 2 Mbps | Gigabit access is sufficient. |
| Changeover switching with a preload cache hit | < 500 KB | ≈ 80 Mbps | Gigabit aggregation |
| Centralized publishing: all terminals retrieve new files. | 10 ~ 50 MB | 1 ~ 4 Gbps | Staggered distribution + load sharing through file-service nodes |
| Video SOP playback online | 2 ~ 6 Mbps | 400 Mbps ~ 1.2 Gbps | Local caching is strongly recommended. |
| Data acquisition and reporting | < 50 Kbps | < 10 Mbps | Negligible |
| Andon and push notifications | < 10 Kbps | < 2 Mbps | Persistent WebSocket connection |
The conclusion is clear:With local caching and staged distribution, the network load from a 200-workstation E-SOP deployment is much lower than commonly assumed.. Gigabit or even 10-gigabit networking is required by solutions that stream every SOP video online without caching. That is an issue with the solution design rather than the network itself.
Deployment process:Seven-day example: 11 implementation steps
The following illustrative schedule spans 7 days for a standard configuration. In-stock all-in-one terminals typically arrive within China in 1–3 days; hardware and network installation takes 1–3 days, depending on quantity. The example allows 40 minutes for server installation and 1 hour for training. The following 11 steps identify responsibilities, durations and potential delays. Project acceptance depends on the agreed scope and trial results.
Hardware / networking / servers
All-in-one terminals in stock
Installation preparation
Electrician / on-site service
40 minutes
Test distribution
Transition to maintenance
Hardware selection D1
Android or Windows? All-in-one sizes range from 18.5 to 32 inches, selected according to workstation viewing distance, installation space and content type. We recommend models and quantities directly from your workstation list.
Hardware installation configuration selection D1
Select rear clamps (fixtures, clips or band clamps) and installation methods (rear clamp, wall mount, cantilever arm or floor stand). Where line modifications are required, include retrofit recommendations.
Network equipment selection D1
Wi-Fi is generally used. Determine AP quantities and locations from workshop area, steel structures and obstructions, and select industrial Wi-Fi 6 access points. Add Ethernet connections for large screens and workstations with strong interference.
Server preparation D1
Generally, Windows 10 or Windows Server 2019 systems can be used. Existing industrial PCs, office computers and servers can be reused, without dedicated hardware purchases.
Hardware and network installation D2-D4
Installation starts once the above selections are finalized and takes 1–3 days, depending on workstation count and site conditions.
All-in-one terminal production and delivery D2-D3
Standard models are in stock, usually arriving within 1–3 days within China, without production scheduling or waiting.
Installation and execution D3-D4
Both installation by your own electricians and on-site installation by personnel sent by the software provider are supported. Rear mounting clips and brackets are supplied with the equipment.
Server installation D5
Once hardware and networking are installed and the server is ready, the software provider's trainer installs the server software. Installation is completed within 40 minutes and the system can be used the same day.
Training D6
Approximately 1 hour: cover all three user levels together—administrators for configuration and publishing, team leaders for changeovers and exceptions, and operators for viewing and confirmation.
Test distribution D6
Distribute SOPs for several products to the terminals, test changeovers, display, confirmation and data acquisition, then roll out across the line after verifying the results.
Maintenance From D7
Routine maintenance covers content updates and version distribution, terminal online status, data backups and remote support, with lifetime free upgrades.
Conditions for this seven-day example:Hardware is in stock., with nationwide delivery in 1–3 days,The network uses Wi-Fi No wiring or modifications required, Use an existing Windows computer as the server Installation completed in 40 minutes,Training takes just 1 hour The interface is designed around operators' working habits. Projects involving production line modifications, synchronization across multiple sites or extensive MES integration are scheduled separately according to the actual workload.
Deployment benefits:Visible costs and less visible benefits
Before deployment, customers often care most about how soon the investment will pay back. Our answer: first calculate four categories of value. The first three can be quantified; the fourth cannot, but delivers the greatest value.
Average reduction
Defect reduction
Printing cost savings
Investment payback period
Calculation 1 · Direct cost savings
Paper, printing, lamination, document holders, filing cabinets and dedicated document administration are all visible costs. For a factory with 200 workstations, assuming 3 product models per workstation, 6 pages per SOP and 1 update per month, annual printing exceeds twenty thousand sheets. Including color printing and lamination, annual spending of RMB 30,000–50,000 is not unusual. This excludes the time process clerks spend organizing, distributing and recovering documents.
After E-SOP deployment, this category of spending is largely eliminated.Customer measurements show an average reduction of more than 90% in paper-related costs.—this benefit alone can usually cover the annual software service fee.
Value category 2 · Improved changeover efficiency
Line changeover is one of the most costly operations in discrete manufacturing. Traditionally, changing a product model involves stopping the line, finding documents, checking versions, distributing them to each workstation, removing old sheets and posting new ones, and confirming the first article. The process takes 20 to 40 minutes. Five changeovers a day can mean two or three hours of lost production capacity.
E-SOP reduces this period to Within three minutes: scan the work-order code → the complete SOP set switches automatically → electronically confirm the first article. Assuming 5 changeovers per line per day, 25 minutes saved per changeover and 300 working days per year, one line can gain an additional 625 hours Effective capacity is one of the most easily overlooked benefits, and one of the easiest to quantify.
Calculation 3 · Lower quality costs
Incorrect assembly, missing parts, wrong materials and incorrect parameter settings: these problems usually arise not because workers are careless, but because Incomplete information delivery: paper documents cannot fully show movement sequences, force directions or clip angles, so new employees must rely on trial and error and experienced coworkers.
Videos, step-by-step illustrations and mandatory confirmation replace reliance on experience with adherence to standards. Customer measurements show that,Incorrect or missing assembly defects decrease by an average of 60%–80%., the proportion of customer complaints relating to failure to follow standard work procedures fell significantly. Savings in quality costs, including rework, scrap, complaint handling and freight, are often greater than savings in paper and labor time.
Benefit 4 · Management and compliance value
This benefit is difficult to quantify, but customers immediately notice it during a factory audit. When an auditor asks when an SOP took effect, who approved it and which version was displayed at a particular workstation at that time, paper-based operations require searching folders and signed forms that may be missing. In E-SOP, three clicks can export the complete record, including timestamps, employee numbers and version numbers.
Training and qualifications are equally clear: a single screen shows who is qualified for each workstation and when each qualification expires. In factories with high staff turnover, this helps reduce quality risks arising from temporary replacements. Improved workshop presentation, paperless ESG indicators and a better impression in customer audits add further value that may not appear directly in reports but is real nonetheless.
Example payback calculation: 200 workstations, single-shift operation.
| Project | Annual expense / benefit | Calculation basis |
|---|---|---|
| Current costs associated with paper SOPs. | - RMB 45,000 | Printing, lamination, mounting, filing cabinets and administrative document handling |
| Current changeover time loss | - RMB 620,000 | 5 lines × 5 changeovers/day × 25 minutes × 300 days × labor cost |
| Quality costs of assembly errors and omissions: current situation | - RMB 180,000 | Rework, scrapping and customer-complaint handling |
| Total current annual losses | ≈ RMB 845,000 | — |
| Savings after E-SOP deployment, conservatively estimated at 60% | + RMB 500,000 | Combined changeover efficiency, quality and paper savings |
| E-SOP investment: software + hardware + implementation | - RMB 450,000–600,000 | 200 workstations, including all-in-one computers and implementation services. |
| Investment payback period | ≈ 12 months | Excludes indirect benefits such as management and compliance. |
These are conservative estimates for typical discrete-manufacturing scenarios. Actual results depend on workstation count, changeover frequency, defect costs and local hourly labor rates. During the assessment, we can prepare an estimate using your factory's actual data., rather than providing a generic template.
These figures come from real workshops
Our customers include listed companies and specialist small factories with only a few dozen employees. Changbao, Saixiang Technology, Gongjin's Vietnam plant, Lingyi Manufacturing and subsidiaries of Han's Laser have chosen E-SOP for different reasons: preparing for customer audits, reducing line changeover time, or preserving the expertise of experienced operators.
When we revisit customers six months after launch, the benefits they describe often go beyond the original project objectives. Some say new employees can start work in three days instead of two weeks. Others say customers were impressed to see a paperless workshop during factory audits. Still others say they can finally understand what each workstation actually does every day.
What E-SOP delivers is more than a screen: it transforms the workshop from relying on people's memory to operating through a system.
See for yourself,E-SOP on the Production Line How it runs
The following are actual photographs and on-site videos from customer workshops, rather than renderings. Videos load and play only when selected, keeping the page static at other times to save bandwidth and maintain loading speed.





On-site video 01
Customer production line · All-in-one terminals in actual operation
On-site Video 02
Demonstration of a set-top box and monitor solution
On-site video 03
On-site changeovers and terminal displays
Product Selection Guide:The real differences between the three approaches
Many products on the market are called E-SOP, yet their underlying capabilities differ enormously. Comparing three typical solutions in one table is more useful than any sales pitch.
| Comparison criteria | Paper SOPs | Standard electronic dashboard | ZEVON Industrial Technology E-SOP |
|---|---|---|---|
| Content formats | Static text and images | Images / PDF | Images / PDF / Video / Animated images / 3D / Multilingual |
| Version control | Manual judgment | Manual file replacement | System-controlled content takes effect automatically |
| Changeover switching | 20–40 minutes | 3–10 minutes to find documents manually | Scan to switch automatically in 1 second. |
| Operation confirmation | Paper signatures | None | Electronic signatures + mandatory confirmation + evidence trail |
| Works offline | Can | Usually unsupported | Local caching maintains normal operation offline |
| Abnormality reporting | Calling out / making phone calls | None | One-tap Andon with automatic timing and statistics |
| Data acquisition | Handwritten reports | None | Barcode scanning, connected equipment or manual input; data returns to MES. |
| Training qualifications | Paper records | None | Online learning and examinations + qualification matrix |
| Audit traceability | Searching folders | No records | All operations are logged and exportable. |
| Expansion capabilities | — | Playback only | Integrates with MES/ERP/PLM/WMS. |
Misconception 1: E-SOP simply puts paper on a screen.
This is the most common misunderstanding and a reason many projects fail. Simply displaying a PDF is little different from posting paper: operators still search for documents during changeovers, judge versions manually and have no records when problems occur.
The real distinction is controlled management:Is content governed by the system? Do releases take effect automatically? Is there an evidence trail for operations? Does data return automatically? Without these four capabilities, the purchase is simply a more expensive display.
Misconception 2: comparing terminal prices while overlooking content costs.
All-in-one terminal prices range from a little over RMB 1,000 to RMB 5,000–6,000, and many people's first reaction is to choose the cheapest. But hardware represents only part of the total project investment. The real workload lies in Content migration Hundreds of SOPs need to be split into pages, reformatted, illustrated and supplemented with videos.
If a supplier only sells hardware and does not support content preparation, all of this work falls on the process engineering department, and the project can easily stall for six months.When selecting a system, clarify who will migrate the content, how much migration is included and whether supporting tools are available.
Misconception 3: Buy hardware first and consider content later
The correct sequence is the reverse: first clarify the content structure—how many product lines, models and processes there are, and what each workstation needs to see—then determine terminal quantities and form factors, and only then discuss purchasing.
We have seen factories buy a hundred all-in-one computers, only to discover after installation that there is no content to display or the content does not fit the screen sizes, leaving them useful only as televisions.Hardware is the last step, not the first.
Misconception 4: Wait until MES is deployed before introducing E-SOP
Waiting to implement E-SOP until MES is in place may sound reasonable, but it can mean missing the best opportunity.
E-SOP can operate entirely independently. Without MES integration, barcode-based switching, local content and terminal data acquisition still deliver paperless operations and efficient changeovers. Once MES is deployed, work orders, materials and personnel data can be connected. This is Seamless upgrades, rather than starting again. Conversely, deploying MES before E-SOP often leaves data acquisition without a practical shop-floor interface because no displays are available at the workstations.
Frequently asked questions:The twelve questions customers ask most often
These are the questions we hear most often on the shop floor. Every answer is practical and direct, without evasiveness.
Q1 · We have only twenty workstations. Is implementation worthwhile?
Yes, but assess the return differently. The main value of E-SOP for a small factory is not paper savings, but Help new employees get started quickly and keep quality consistent.. Small factories with twenty workstations often have high staff turnover and few experienced operators. Animated SOPs can significantly shorten training. Our smallest customer has just eight workstations.
Q2 · Can existing Android all-in-one computers be used directly?
Most can be reused. Devices generally work if they run Android 7.0 or later, support APK installation and have a stable network interface. We conduct compatibility testing before deciding whether replacement is necessary. Devices that cannot be reused are usually older units with less than 2 GB of memory.
Q3 · What happens if the network goes down?
Operation continues as normal. SOP files are cached locally on terminals in advance, allowing playback, confirmations and data collection to continue during network outages. Data is stored locally and automatically uploaded when connectivity returns, without losing records. Terminals display an offline indicator, and managers can see which terminals are offline and for how long.
Q4 · What if older workers do not know how to use it?
E-SOP operation involves only three actions:View, swipe, tap—view the current step, swipe left or right to turn pages, and tap the confirmation button. No typing, conventional login or password memorization is required; a card or employee number is sufficient. From the outset, we designed operation to be possible even while wearing gloves.
Q5 · Who prepares SOP content?
The intellectual property in the content belongs to the factory, and the process department must lead its development. We provide three tools to reduce the workload: bulk-import templates, which generate content with one click after Excel data entry; an online drag-and-drop editor requiring no design background; and implementation-stage process consultants to help organize a model production line.We do not write SOPs for you, but we teach you how to complete them as efficiently as possible.
Q6 · Can it integrate with our MES?
Yes. Standard RESTful APIs are provided, along with three other methods: staging tables, database views and file exchange, for four methods in total. Connected systems include mainstream MES/ERP platforms such as SAP, Yonyou, Kingdee, Digiwin, Pangu and Moore. Integration typically takes 5–15 person-days, depending on the openness of the other system's interfaces.
Q7 · Where is the data stored? Is it secure?
Deployed by default on the customer's own server or private cloud,Data stays inside the factory. HTTPS/TLS is mandatory for transmission; sensitive fields use AES-256 encryption. Access is controlled by both role and data scope, and critical actions are recorded in audit logs that cannot be deleted or altered. Materials for China's classified cybersecurity protection assessments are available on request.
Q8 · Does it support multiple languages?
Yes. One SOP can maintain multiple language versions, with terminals switching automatically by workstation or worker account. Implemented languages include Chinese, English, Vietnamese, Thai, Spanish, German and Japanese. Multinational factories commonly use parallel Chinese master and local-language versions.
Q9 · Approximately how much does one workstation cost?
Cost depends on three components: software licensing, charged per workstation or factory; hardware, such as all-in-one terminals, tablets or boxes, with a wide price range; and implementation services, including content migration and integration. We do not quote a generic price of X yuan per workstation because project configurations vary too widely.Provide the workstation count, existing hardware and integration requirements to receive an itemized quotation within one day.
Q10 · How long does deployment take?
Approximately 30 days for up to 50 workstations and 60–90 days for 200 workstations. Projects covering multiple sites or requiring deep MES integration take more than 90 days. Most time is spent on content migration and pilot operation; software deployment itself is a small part.We do not promise deployment within one week: that would mean skipping trial operation and merely postponing risks until mass production.
Q11 · Who handles ongoing maintenance?
Remote and on-site support are provided during the warranty period. Routine maintenance involves three tasks: content updates performed by the factory, system backups that can be automated, and terminal troubleshooting, usually handled through straightforward, low-cost replacement. We provide operation and maintenance manuals and training so the factory's IT or equipment department can independently resolve 90% of routine issues.
Q12 · How does this differ from other E-SOP systems?
Three points:First, thirty-three years of manufacturing experience, we understand how workshops actually operate;Second, no hardware lock-in, choose equipment for the on-site conditions; the software can run on it all;Third, we commit to operation during network outages, because we have fully developed local caching. For other differences, you are welcome to bring your factory's actual SOPs for an on-site comparison.