Browse product categories

24-inch Windows Touch All-in-One PC
24-inch Windows touch all-in-one PC, MES tablet, windows esop, windows sop, windows electronic work instructions
Enquire about this product24-inch Windows touch all-in-one PC MES tablet sopwindows sopesop windows sop windows electronic work instructions
10.4-inch Windows touch all-in-one PC MES tablet windows esop windows sop windows electronic work instructions










| System | CPU | Intel® Celeron J1900 quad-core 1.99G | ||||||||||||
| Memory | 4GB | |||||||||||||
| Solid-state drive | 64GB | |||||||||||||
| Operating system | Windows 10 64-bit (64-bit requires 64GB or more storage) | |||||||||||||
| Display | LED screen | 10.4" LED screen | ||||||||||||
| Resolution | 1366*768 , 21.5-inch is 1920*1080 | |||||||||||||
| Contrast ratio | 800:1 (Typ.) (transmissive) | |||||||||||||
| Brightness | 250 cd/m² (Typ.) | |||||||||||||
| Viewing angle | 70/85/70/80 (Typ.)(CR≥10 | |||||||||||||
| Bare unit dimensions | 465*288*44mm | |||||||||||||
| Net weight | 4.15kg | |||||||||||||
| Screen ratio | 16:9 / display area: 408x229mm | |||||||||||||
| Network | WiFi | Yes | ||||||||||||
| Ethernet | Supported | |||||||||||||
| Bluetooth | BlueTooth4.0 | |||||||||||||
| Interfaces | Mini USB | USB OTG (1037U: 2.0*4) (J1900: 2.0*2 / 3.0*2) | ||||||||||||
| RJ-45 Ethernet port | 1 | |||||||||||||
| Power jack | DC 12V power input | |||||||||||||
| Audio | Stereo HD | |||||||||||||
| COM port | RS232 | |||||||||||||
| Other interfaces | PS&2 LPT&1 VGA&1*COM | |||||||||||||
| Expansion slot | 1 * MINI PCI-E slot, supports PCIe 3G and WIFI signal | |||||||||||||
| Media playback | Video formats | MPEG-1,MPEG-2,MPEG-4,H.263,H.264,VC1,RV etc. Support up to 1080p | ||||||||||||
| Audio formats | MP3/WMA/AAC etc. | |||||||||||||
| Image formats | JPEG,JPG | |||||||||||||
| Other functions | Wireless mouse | Supported | ||||||||||||
| Wireless keyboard | Supported | |||||||||||||
| Speakers | 2*3W | |||||||||||||
| OSD languages | OSD operation in Chinese, English and other languages | |||||||||||||
| Special functions | Supports ACPI S3 power saving mode | |||||||||||||
| Supports CPU smart fan | ||||||||||||||
| Supports watchdog technology | ||||||||||||||
| Accessories | Adapter | Power adapter 12V/5A | ||||||||||||
| Wall-mount metal bracket | Optional | |||||||||||||
Please contact us for the configuration and specification of this product.
No file is currently published for this product. Email zy@erpsz.net with the product model to request documentation.
Frequently asked questions
What is 24-inch Windows Touch All-in-One PC?
24-inch Windows Touch All-in-One PC: 24-inch Windows touch all-in-one PC, MES tablet, windows esop, windows sop, windows electronic work instructions
Who provides 24-inch Windows Touch All-in-One PC?
Kechuang Zhiyuan Technology provides it. Founded in 1993, the company covers industrial hardware manufacturing, digital factory systems and smart city integration.
Which industries use it?
Manufacturing, automotive, electronics, food and beverage, logistics and public infrastructure projects.
How do I get specifications or a quotation?
Email zy@erpsz.net with your application, volume and delivery location. The team replies with specifications, lead time and pricing.
10-inch Windows Touch All-in-One Computer
12-inch Windows Touch All-in-One Computer
15-inch Windows Touch All-in-One Computer
17-inch Windows Touch All-in-One Computer