PRODUCTS

Products

Android touch all-in-one machine Windows touch all-in-one machine Industrial Computers
15-inch Windows Touch All-in-One Computer

15-inch Windows Touch All-in-One Computer

15-inch Windows touch all-in-one computer for industrial applications. Confirm processor, memory, storage, interfaces and enclosure options for your requirements.

Enquire about this product

15-inch Windows Touch All-in-One Computer

Windows touch all-in-one computers combine a touch display with an industrial computer for production-line terminals, self-service applications and wall-mounted industrial installations. The available hardware, operating system and enclosure depend on the selected configuration.

Configuration options

  • Operating systems: The product range lists Windows 7 and Windows 10 configurations. Confirm the operating system supplied with the selected hardware.

  • Processors: Celeron, Core i3, Core i5 and Core i7 options, with different processor generations available according to configuration.

  • Memory: 8 GB, 16 GB, 32 GB or larger configurations, subject to the selected hardware.

  • Storage: 32 GB, 64 GB, 256 GB, 500 GB or larger capacities, according to requirements.

  • Interfaces: USB, COM, RS-232 and RS-485 options, depending on the configuration.

  • Display: The range commonly lists 1920 × 1080 resolution; confirm the panel specification for the selected size and model.

  • Connectivity: Ethernet and Wi-Fi options, with internal or external antennas depending on the build.

Enclosure and protection

Engineering-plastic and steel/aluminium-alloy enclosure options are listed for the range. Metal enclosures support heat dissipation. Capacitive-touch, fully enclosed flat-front and rugged variants are available in the product range, including IP65 dust- and water-resistant configurations. Confirm the applicable protection rating, mounting arrangement, power supply, tempered-glass protection and supplied accessories for the selected model.

The wider product family covers sizes from 10 to 100 inches. Options described here are configuration choices across the range, not a guarantee that every option is included in each unit. Please confirm the required hardware, operating system and environmental protection before ordering.

O1CN01bOOX4P2LxDfZkELLn_!!2216112249758-0-cib.jpg