Products
13.3inch Android touch all-in-one machine

13.3inch Android touch all-in-one machine

There are 10 to 100 inch touchscreens available, and Android versions range from 4.4 to 13. The motherboard includes A33, A64, RK3188, RK3288, RK3566, and RK3399. We are waiting for hundreds of options and recommend different motherboards, CPUs, and GPUs according to your needs,The Android touchscreen interface comes with a variety of interfaces, including speakers, WiFi, Bluetooth, SD, HDI, USB, and more

10 inch Android touch all-in-one machine

10 inch Android touch all-in-one machine

There are 10 to 100 inch touchscreens available, and Android versions range from 4.4 to 13. The motherboard includes A33, A64, RK3188, RK3288, RK3566, and RK3399. We are waiting for hundreds of options and recommend different motherboards, CPUs, and GPUs according to your needs,The Android touchscreen interface comes with a variety of interfaces, including speakers, WiFi, Bluetooth, SD, HDI, USB, and more

MPPT Solar Charge Controller

MPPT Solar Charge Controller

12/24/36/48V Voc 18-150V Heatsink Cooling 12V/24V/48V Auto work,parallel design,Multi-stage charging optimizes battery performance,MPPT eficiency >99.5%, Peak conversion efficiency 97.5%,Compatible with Gel. AGM.Flooded. Sealed lead acid and Lithium battery,Comprehensive protection,Heatsink cooling, quiet operation,Comfortable installation and commissioning,Monitoring your solar harvest on line via RS485 communition, Ethernet/RS232 communition Optional