Browse product categories

18.5-inch Narrow-Bezel Android Touch Computer (2026)
An 18.5-inch touch all-in-one computer from the 2026 narrow-bezel range, with configuration options for industrial display and touch applications.
Enquire about this product18.5-inch Narrow-Bezel Android Touch Computer (2026)
An 18.5-inch touch all-in-one computer from the 2026 narrow-bezel range, with configuration options for industrial display and touch applications.
Touch display and integration
The series provides capacitive multi-touch and wired or wireless connectivity options. Confirm the screen, mounting arrangement, computing board and peripheral interfaces for your installation.
Configuration for your application
Operating systems, wireless modules, identification modules and AI expansion are configuration choices. They are not all included in every unit. Contact us with your required screen size, software environment, interfaces and deployment region so the supplied configuration can be confirmed.
Product views




Configuration options
The following information describes options in the supplier’s product series. Confirm the exact specification and included modules for the selected model before ordering.
| Displayed model | 18.5-inch narrow-bezel model. |
|---|---|
| Series screen-size options | 14.1, 15.6, 18.5, 21.5, 24, 27, 32, 43, 55, 101 and 150 inches are listed across the wider series; availability and specification must be confirmed for each model. |
| Operating-system options | Android 10–16 or HarmonyOS, depending on the selected computing board and software build; confirm the supplied version. |
| Display | LED touch display; IPS wide-viewing-angle screen options. |
| Resolution options | 1366 × 768 or 1920 × 1080, depending on the selected screen. Confirm the native resolution of the ordered model. |
| Touch | 10-point capacitive touch. |
| Wireless options | Wi-Fi, dual Wi-Fi, Wi-Fi 6/7 and Bluetooth options depend on the wireless module. |
| Wired network | 10/100/1000 Mbps Ethernet options; confirm the selected board. |
| Interface options | HDMI, USB, SD card, Mini USB and USB Type-C. The series information lists three USB ports and 32 GB SD-card support; actual interfaces depend on configuration. |
| AI expansion | GPU and edge-computing expansion options. Model compatibility and performance depend on the computing hardware, software and integration. |
| Identification options | Fingerprint recognition, ID/IC cards, RF modules and monocular or binocular face-recognition modules; confirm module and software compatibility. |
| Mobile connectivity option | 5G IoT/SIM connectivity and external-antenna options; confirm carrier, frequency bands and regional compatibility. |
No file is currently published for this product. Email zy@erpsz.net with the product model to request documentation.
10-inch Android Touch All-in-One Computer
13.3-inch Android Touch All-in-One Computer
14-inch Android Touch All-in-One Computer
15-inch Android Touch All-in-One Computer