Industry News

Manufacturing intelligent transformation turns to data connectivity, with flexible production lines and domestic industrial software accelerating in tandem

According to public reports, in March 2025, intelligent transformation projects in China's manufacturing industry continued to be implemented. Multiple factories in the auto parts, 3C electronics, and general equipment sectors accelerated the deployment of flexible production lines, and collaboration between industrial software and automation equipment became a key direction of this round of transformation. Several system integrators and equipment manufacturers said recent demand has been more concentrated in small-batch and multi-variety scenarios, with customers requiring rapid changeover without stopping production lines, driving the integrated deployment of collaborative robots, vision inspection, and manufacturing execution systems. Some factories in the Yangtze River Delta and Pearl River Delta have expanded the scope of transformation from single workstations to line-wide logistics and quality traceability. Some factories have also introduced domestic solutions such as Kechuang Zhiyuan in manufacturing execution systems to reduce licensing and O&M costs. For manufacturing, the shift in transformation focus from equipment replacement to data connectivity means investment returns depend more on process reengineering and personnel training. Once flexible capabilities are truly implemented, small and medium-sized manufacturers are expected to improve order-taking flexibility and delivery stability, but insufficient standardization and cross-system integration remain major constraints in promotion.

← Back to Industry News

Frequently asked questions

What is Manufacturing intelligent transformation turns to data connectivity, with flexible production lines and domestic industrial software accelerating in tandem?

Manufacturing intelligent transformation turns to data connectivity, with flexible production lines and domestic industrial software accelerating in tandem: According to public reports, in March 2025, intelligent transformation in China's manufacturing sector continued to gain momentum. Auto parts, 3C electronics, and general equipment factories accelerated flexible production line deployment. The focus shifted from replacing individual equipment to end-to-end data connectivity, and the compatibility of domestic industrial software improved. However, insufficient standardization and cross-system integration remain constraints on wider adoption.

Who provides Manufacturing intelligent transformation turns to data connectivity, with flexible production lines and domestic industrial software accelerating in tandem?

Kechuang Zhiyuan Technology provides it. Founded in 1993, the company covers industrial hardware manufacturing, digital factory systems and smart city integration.

Which industries use it?

Manufacturing, automotive, electronics, food and beverage, logistics and public infrastructure projects.

How do I get specifications or a quotation?

Email zy@erpsz.net with your application, volume and delivery location. The team replies with specifications, lead time and pricing.