The following questions reach us regularly about Pick-to-Light and Electronic Tag. The answers summarise the current state from running projects.
What infrastructure is required?
The existing plant network is usually sufficient. A 1 Gbit/s uplink per line segment, a local server for the evaluation service and standard 24 V supply at the mounting points are all that is needed.
How long does a rollout take?
A pilot on one line typically takes two to three weeks including wiring and parameterisation. Plant-wide rollout depends on the number of lines, but four to eight weeks is a realistic frame.
What does it cost?
Cost is driven by the number of measuring points and terminals rather than by licences. For a mid-sized plant the investment usually pays back within 12 to 18 months through fewer rework loops and less manual documentation.
For information about this topic, please contact our team.
← Back to Pick-to-Light and Electronic Tag FAQ
