ESD Monitoring FAQ

ESD Monitoring — Frequently Asked Questions

The following questions reach us regularly about ESD Monitoring. The answers summarise the current state from running projects.

What infrastructure is required?

The existing plant network is usually sufficient. A 1 Gbit/s uplink per line segment, a local server for the evaluation service and standard 24 V supply at the mounting points are all that is needed.

How long does a rollout take?

A pilot on one line typically takes two to three weeks including wiring and parameterisation. Plant-wide rollout depends on the number of lines, but four to eight weeks is a realistic frame.

What does it cost?

Cost is driven by the number of measuring points and terminals rather than by licences. For a mid-sized plant the investment usually pays back within 12 to 18 months through fewer rework loops and less manual documentation.