PRODUCTS

Products

Browse product categories
Y100 10.1-inch Rugged Android Tablet

Y100 10.1-inch Rugged Android Tablet

Y100 rugged Android tablet with a 10.1-inch touch display, Android 13, an octa-core 2.2 GHz processor, 6 GB RAM, 128 GB storage and optional data-capture modules.

Enquire about this product

Y100 10.1-inch Rugged Android Tablet

The Y100 combines a 10.1-inch touch display with Android 13 and an octa-core 2.2 GHz processor. The standard configuration has 6 GB of RAM and 128 GB of storage.

Touch operation for field work

The HD display supports multi-touch, glove operation, touch operation in wet conditions and signatures using a passive stylus. Confirm the required accessories and operating conditions for your application.

Rugged enclosure and battery

The enclosure uses high-strength industrial materials. The product specification describes a 1 m drop-test requirement. A built-in 10,000 mAh battery supports mobile work; actual operating time depends on the workload, display settings, wireless connections and optional modules.

Optional data-capture modules

Available options include a barcode scanner, NFC, UHF RFID, an ID-card decoding module and a fingerprint module. Module availability and compatibility depend on the selected configuration.

Contact us to confirm the required modules, accessories and environmental protection rating for the exact model before ordering.

Front-facing NFC option

The NFC module operates at 13.56 MHz and supports ISO 14443 A/B, ISO 15693, NFC-IP1 and NFC-IP2 protocols. Access, attendance, transit and membership card applications depend on the selected card, module and application software.

Y100 rugged tablet with optional front-facing NFC module and English feature descriptions

Application integration

The tablet can be evaluated for inventory counting, warehousing, vehicle management, livestock management, healthcare and industrial data collection. Required software, accessories and data interfaces depend on the project.