PRODUCTS

Products

Browse product categories
12.1-inch Android Touch All-in-One Computer

12.1-inch Android Touch All-in-One Computer

12.1-inch Android touch all-in-one computer with configurable computing boards, connectivity and application software.

Enquire about this product

12.1-inch Android Touch All-in-One Computer

12.1-inch Android touch all-in-one computer with configurable computing boards, connectivity and application software.

Select the computing configuration

Board options in the series include A33, A64, RK3188, RK3288, RK3566 and RK3399. CPU and GPU capabilities depend on the board. Android versions from 4.4 to 13 are listed across the series; confirm the supplied version and application compatibility for the selected model.

Connectivity and installation

The series lists speakers, Wi-Fi, Bluetooth, SD-card support and USB connectivity. Display-output connectors, port quantities, power supply and installation accessories depend on the selected configuration. Confirm your interface and mounting requirements before ordering.

Documents and engineering files

Office and WPS documents, Excel spreadsheets, Word documents, PowerPoint presentations, PDF files and JPG images require compatible installed applications. CAD, Pro/E and SolidWorks drawings, as well as 3D animations, require suitable Android viewing software or file conversion. Check the required file formats, file sizes and model complexity with your application software.

Media playback

Listed container formats include AVI, RM, RMVB, MKV, WMV, MOV, MP4, DAT/VCD, VOB/DVD, PMP, MPEG/MPG, FLV, ASF, TS, TP and 3GP. The codec list includes H.264, H.263, DivX, Xvid and MPEG. Actual playback depends on the board, Android build, player software, codec, resolution and bitrate.

Android touch computer product-family illustration
Product-family illustration. Enclosure, screen and board configurations vary by model.