Project overview
Customer: Changbao
Location: Changzhou, Jiangsu, China
Applications: Windows ESOP; Andon; production displays
Customer background
Jiangsu Changbao Steel Tube manufactures specialist tubes for energy, boilers, engineering machinery, petrochemical equipment, vehicles and other applications.
Published project scope
Following an ESOP selection process, Changbao selected Zhiyuan electronic work instructions, Andon calling, Wi-Fi programmable warning lights and production displays. The announcement specifies Windows-based ESOP with 27-inch and 43-inch equipment.

For information about this topic, please contact our team.
← Back to ESOP Case Studies
