
32-inch Windows Touch All-in-One Computer
32-inch Windows touch all-in-one computer for industrial applications. Confirm processor, memory, storage, interfaces and enclosure options for your requirements.
Enquire about this product32-inch Windows Touch All-in-One Computer
Windows touch all-in-one computers combine a touch display with an industrial computer for production-line terminals, self-service applications and wall-mounted industrial installations. The available hardware, operating system and enclosure depend on the selected configuration.
Configuration options
Operating systems: The product range lists Windows 7 and Windows 10 configurations. Confirm the operating system supplied with the selected hardware.
Processors: Celeron, Core i3, Core i5 and Core i7 options, with different processor generations available according to configuration.
Memory: 8 GB, 16 GB, 32 GB or larger configurations, subject to the selected hardware.
Storage: 32 GB, 64 GB, 256 GB, 500 GB or larger capacities, according to requirements.
Interfaces: USB, COM, RS-232 and RS-485 options, depending on the configuration.
Display: The range commonly lists 1920 × 1080 resolution; confirm the panel specification for the selected size and model.
Connectivity: Ethernet and Wi-Fi options, with internal or external antennas depending on the build.
Enclosure and protection
Engineering-plastic and steel/aluminium-alloy enclosure options are listed for the range. Metal enclosures support heat dissipation. Capacitive-touch, fully enclosed flat-front and rugged variants are available in the product range, including IP65 dust- and water-resistant configurations. Confirm the applicable protection rating, mounting arrangement, power supply, tempered-glass protection and supplied accessories for the selected model.
The wider product family covers sizes from 10 to 100 inches. Options described here are configuration choices across the range, not a guarantee that every option is included in each unit. Please confirm the required hardware, operating system and environmental protection before ordering.















32-inch Windows Touch All-in-One Computer
| Operating-system options | Windows 7 / Windows 10; confirm the supplied configuration |
|---|---|
| Processor options | Celeron / Core i3 / Core i5 / Core i7; generation depends on configuration |
| Memory options | 8 GB / 16 GB / 32 GB or larger |
| Storage options | 32 GB / 64 GB / 256 GB / 500 GB or larger |
| Interface options | USB / COM / RS-232 / RS-485 |
| Typical display resolution in the range | 1920 × 1080; confirm the selected panel |
| Network options | Ethernet; Wi-Fi with internal or external antenna |
| Enclosure options | Engineering plastic or steel/aluminium alloy |
| Touch and protection options | Capacitive touch; fully enclosed flat-front and IP65 variants available in the range; confirm the rating of the selected model |
| Mounting and accessories | Wall-mounted options, power supply and tempered-glass protection; confirm the supplied arrangement |
These are product-range options. The final specification depends on the selected model and configuration.
No file is currently published for this product. Email zy@erpsz.net with the product model to request documentation.
10-inch Windows Touch All-in-One Computer
12-inch Windows Touch All-in-One Computer
15-inch Windows Touch All-in-One Computer
17-inch Windows Touch All-in-One Computer